Laserfiche WebLink
SECTION 01380 <br /> CONSTRUCTION PHOTOGRAPHS <br /> ' 1 . 1 SUMMARY <br /> ' A. This Section specifies requirements of photographic documentation of project <br /> conditions before , during , and after construction . <br /> ' Be Take photographs of: <br /> 1 . All work areas just prior to construction ; <br /> 2 . Construction progress , installation of major equipment, and unusual <br /> construction conditions , and <br /> 3 . All work areas after construction . <br /> ' C . The ENGINEER has the authority to reject any or all photographs and order that <br /> they be redone at no additional charge . Re- photograph areas of unacceptable <br /> ' coverage within five (5 ) days after being notified by the ENGINEER . All <br /> photographs shall become the property of the OWNER . <br /> ' 1 . 2 SUBMITTALS <br /> A. Furnish one ( 1 ) copy of all photographs to the ENGINEER during each submittal . <br /> iBe Required submittals : <br /> 1 . Pre-construction photographs : Submit before construction activities <br /> commence . <br /> 2 . Construction progress photographs and other construction photographs : <br /> Submit with each pay request. <br /> ' 3 . Post-construction photographs : Submit with the final application for payment. <br /> Be Photographs : All photographs shall be in color. Provide the photographs in two <br /> ' formats : <br /> 1 . hard -copy (3-inch by 5-inch ) ; <br /> 2e digital photographs on 3 . 5-inch disks or CD ' s . <br /> 1 . 3 QUALITY ASSURANCE <br /> ' A . Take post-construction photographs at the same time of day as those taken for preen <br /> construction records . <br /> Be Index and catalog photographs in such a manner that each scene is readily <br /> Last revised 5/30/02 01380- 1 EAST GIFFORD <br /> ' FAPublic WorksVeithmstormvater Projects\Gifford East\Construction Contract\Technical Specifications\Final Specifications\Division <br /> 1 \01 380 - Construction Photographs.doc <br />