My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-118A.2
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-118A.2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2016 4:59:13 PM
Creation date
9/30/2015 6:32:48 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/20/2003
Control Number
2003-118A.2
Agenda Item Number
7.F.
Entity Name
East Gifford Stormwater Improvements
Subject
Volume 2 Specifications and contract documents
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3252
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
identifiable . (e . g . For each photograph , provide appropriate written documentation <br /> describing the location , orientation of view, date , time of day, and other pertinent <br /> comments . ) <br /> 2 . 1 CONSTRUCTION DOCUMENTATION <br /> A . Pre-Construction Photographs : <br /> 1 . Within fourteen days before construction commences , take photographs of <br /> all areas where construction is to take place . The purpose of the prem <br /> construction photographs is to determine any damage to private or public <br /> property during construction . These photographs will serve as a record of <br /> existing conditions for disputes arising from the restoration , and shall <br /> therefore clearly depict details of existing conditions . <br /> 2 . Photograph coverage shall include all surface features located within the <br /> zone of influence of .construction . Such coverage shall include , but not be <br /> limited to , existing driveways , sidewalks , curbs , pavements , ditches , <br /> mailboxes , landscaping , trees , culverts , fences , signs , and headwalls within <br /> the area covered . <br /> t3 . No construction shall begin prior to the ENGINEER' s review of the <br /> photographs covering the construction area . <br /> Be Construction Progress Photographs and Other Construction Photographs : <br /> 1 . Take photographs as necessary during construction to clearly document <br /> ' construction phases , installation of major equipment, and construction <br /> progress . <br /> 2 . Photograph unusual conditions encountered during construction . <br /> 3 . Submit construction photographs with each pay request for the period <br /> covered by that pay request. <br /> C . Post-Construction Photographs : Upon completion of construction work and before <br /> final payment, take photographs of all completed construction and of all areas <br /> disturbed or restored by construction activities . <br /> + + END OF SECTION + + <br /> Last revised 5/30/02 01380=2 EAST GIFFORD <br /> ' RIPublic WorksVeithM\Stormweter Projects\Giftord East\Construction Contract%chnical Specifications\Final Specifications\Division <br /> 1 \01380 - Construction Photographs.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.