My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-118A.2
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-118A.2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2016 4:59:13 PM
Creation date
9/30/2015 6:32:48 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/20/2003
Control Number
2003-118A.2
Agenda Item Number
7.F.
Entity Name
East Gifford Stormwater Improvements
Subject
Volume 2 Specifications and contract documents
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3252
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br /> SECTION 01410 <br /> TESTING LABORATORY SERVICES <br /> 1 . 1 GENERAL <br /> A. The OWNER will employ and pay for an independent testing laboratory to perform <br /> the specified services . The testing laboratory shall be : <br /> ' AM Engineering & Testing , Inc. <br /> Contact person = David Aucker <br /> Telephone number = (772 ) 567=6167 . <br /> 1 Even though the OWNER is hiring the testing laboratory, the CONTRACTOR shall <br /> schedule and order all testing services . <br /> Be Inspection , sampling and testing shall be as specified in the individual Sections . <br /> These may include but are not limited to : <br /> 1 . Section 03300 , Concrete . <br /> 2 . Section 02220 , Excavation and Backfill . <br /> C . The OWNER will pay for the testing listed above except for repeat testing due to <br /> test results failing to meet the Specification requirements . <br /> D . CONTRACTOR shall pay for: <br /> 1 . Tests not listed above . <br /> 2 . Tests made for the CONTRACTOR's convenience . <br /> 3 . Repeat tests required because of failure to meet Specification requirements . <br /> E . The testinglaboratory is not authorized to approve or accept an portion of the <br /> rY PP P Y <br /> Work ; rescind , alter or augment the requirements of the Contract Documents ; or <br /> perform any duties of the CONTRACTOR . <br /> 1 . 2 CONTRACTOR'S RESPONSIBILITIES <br /> A . Cooperate with laboratory Personnel Provide access to Work and to <br /> manufacturer's operations . <br /> Be Provide to laboratory, preliminary representative samples of materials to be tested , <br /> ' in required quantities . <br /> Co Furnish copies of product test reports . <br /> ' D . Provide to the laboratory the preliminary design mix proposed for concrete , and <br /> other material mixes that require testing by the testing laboratory. <br /> Last revised 5/30/02 01410= 1 EAST GIFFORD <br /> FAPublic WorksWeithM\Storm ester Projects\Gifford East\Construction ContrachTechnical Specifications\Final Specifications\Division <br /> 1 \01410 - Testing Laboratory Services.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.