My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-118A.2
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-118A.2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2016 4:59:13 PM
Creation date
9/30/2015 6:32:48 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/20/2003
Control Number
2003-118A.2
Agenda Item Number
7.F.
Entity Name
East Gifford Stormwater Improvements
Subject
Volume 2 Specifications and contract documents
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3252
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01520 <br /> CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS <br /> 1 . 1 SCOPE <br /> A . Provide all construction equipment and facilities and temporary controls <br /> required to satisfactorily complete the work represented on the Drawings <br /> and described in the Specifications . <br /> 1 . 2 RESPONSIBILITY <br /> A . All construction facilities and temporary controls remain the property of the <br /> Contractor establishing them and shall be maintained in a safe and useful <br /> condition until removed from the construction site . <br /> B . All false work , scaffolding , ladders , hoistways , braces , pumping plants , <br /> shields , trestles , roadways , sheeting , centering forms , barricades , drains , <br /> flumes , and the like , any of which may be needed in construction of any <br /> I part of the work and which are not herein described or specified in detail , <br /> must be furnished , maintained and removed by the CONTRACTOR , who <br /> is responsible for the safety and efficiency of such work and for any <br /> 1 damage that may result from their failure or from their improper <br /> construction , maintenance or operation . <br /> ' C . In accepting the Contract , the CONTRACTOR assumes full responsibility <br /> for the sufficiency and safety of all hoists , cranes , temporary structures or <br /> work and for any damage which may result from their failure or their <br /> iimproper construction , maintenance or operation and will indemnify and <br /> save harmless the OWNER and ENGINEER from all claims , suits or <br /> ' actions and damages or costs of every description arising by reason of <br /> failure to comply with the above provision . <br /> ' 1 . 3 TEMPORARY UTILITIES AND SERVICES <br /> A . TEMPORARY WATER <br /> 1 . Provide a temporary water service as required for all construction <br /> purposes and pay for all water used . <br /> 2 . Furnish potable drinking water in suitable dispensers and with cups <br /> ' for use of all employees at the job . <br /> 3 . Provide all temporary piping , hoses , etc . , required to transport <br /> ' Last revised 7/ 17/01 01520- 1 EAST GIFFORD <br /> FAPublic Works\KeithM\Stormwater Projects\Gifford East\Construction Contract\Technical Specifications\Division 1 \01520 - <br /> Construction Facilities & Temporary Control .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.