My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-118A.2
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-118A.2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2016 4:59:13 PM
Creation date
9/30/2015 6:32:48 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/20/2003
Control Number
2003-118A.2
Agenda Item Number
7.F.
Entity Name
East Gifford Stormwater Improvements
Subject
Volume 2 Specifications and contract documents
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3252
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
water to the point of usage by all trades . <br /> 4 . When temporary water service is no longer required , remove all <br /> temporary water lines . <br /> B . TEMPORARY SANITARY FACILITIES <br /> 1 . Provide temporary toilet facilities separate from the job office . <br /> Maintain these during the entire period of construction under this <br /> Contract for the use of all construction personnel on the job . <br /> Provide enough chemical toilets to conveniently serve the needs of <br /> all personnel . Properly seclude toilet facilities from public <br /> ' observation . <br /> 2 . Chemical toilets and their maintenance shall meet the requirements <br /> of State and local health regulations and ordinances . Immediately <br /> correct any facilities or maintenance methods failing to meet these <br /> requirements . Upon completion of work , remove the facilities from <br /> the premises . <br /> C . TEMPORARY ELECTRICITY <br /> 1 . Provide temporary electric service as required for all construction <br /> purposes and pay for all electricity used . <br /> 1 .4 CONSTRUCTION AIDS <br /> ' A . MATERIAL HOISTS AND CRANES <br /> 1 . Provide material hoists required for normal use by all trades and <br /> ' employ skilled hoist operators . Provide all necessary guards , <br /> signals , safety devices , etc . , required for safe hoist operation . The <br /> ' construction and operation of material hoists shall be in accordance <br /> with the applicable ANSI Standards , the " Manual Code of Accident <br /> Prevention in Construction " of the Associated General Contractors <br /> of America , OSHA , and of other Federal , State and municipal <br /> codes or ordinances . Prohibit the use of hoist for transporting <br /> personnel . Hoists shall be located to avoid risk of damage to <br /> completed work. <br /> 2 . Special rigging and hoisting facilities shall be provided by each <br /> trade requiring their use . <br /> ' B . TEMPORARY RUNWAYS , SCAFFOLDING , AND LADDERS <br /> 1 . Provide temporary ladders , ramps , and runways as required for <br /> ' performance and inspection of the work . Construct and maintained <br /> these facilities in accordance with the applicable Federal , State , <br /> iLast revised 7/17/01 01520-2 EAST GIFFORD <br /> FAPublic Works\KeithM\Stormwater Projects\Gifford East\Construction Contract\Technical Specifications\Division 1 \01 520 - <br /> ' Construction Facilities & Temporary Control .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.