My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-118A.2
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-118A.2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2016 4:59:13 PM
Creation date
9/30/2015 6:32:48 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/20/2003
Control Number
2003-118A.2
Agenda Item Number
7.F.
Entity Name
East Gifford Stormwater Improvements
Subject
Volume 2 Specifications and contract documents
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3252
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and Municipal regulations and codes . <br /> 2 . Erect permanent stairs , if any , as soon as possible , and provide <br /> suitable temporary treads , risers , railings , etc . , as required for <br /> safety. <br /> 3 . Furnish , erect , and maintain all scaffolding required for this work . <br /> Construct and maintain scaffolding in accordance with applicable <br /> State and Federal laws and local ordinances . Promptly remove <br /> scaffolding after it has served its purpose . <br /> 4 . The structural strength and safety of scaffolding , runways , covers , <br /> railings , ladders , stairs , etc . , and compliance with law shall be the <br /> ' sole responsibility of the CONTRACTOR . <br /> C . TEMPORARY CHUTES - No materials shall be dropped from structures <br /> ' except through enclosed wooden or metal chutes which shall be provided <br /> and maintained as required for the performance of the work by the various <br /> trades. <br /> 1 . 5 SECURITY <br /> ' A . Full time watchmen will not be specifically required as a part of the <br /> Contract , but the CONTRACTOR shall provide inspection of work area <br /> daily and shall take whatever measures are necessary to protect the <br /> ' safety of the public , workmen , and materials , and provide for the security <br /> of the site , both day and night. <br /> ' 1 . 6 TEMPORARY CONTROLS <br /> A . Take all necessary precautions to control dust and mud associated with <br /> the work of this Contract . In dry weather, spray dusty areas daily with <br /> water in order to control dust . Take necessary steps to prevent the <br /> tracking of mud onto adjacent streets and highways . <br /> 1 . 7 REMOVAL OF TEMPORARY CONSTRUCTION FACILITIES <br /> A . Remove the various temporary facilities , services , and controls and legally <br /> dispose of them as soon as the work is complete . The areas of the site <br /> ' used for temporary facilities shall be properly reconditioned and restored <br /> to a condition acceptable to the OWNER . <br /> + + END OF SECTION + + <br /> ' Last revised 7/17/01 01520-3 EAST GIFFORD <br /> F :\Public Works\KeithM\Stormwater Projects\Gifford East\Construction Contract\Technical Specifications\Division 1 \01 520 - <br /> ' Construction Facilities & Temporary Control .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.