Laserfiche WebLink
' replacement trees shall be the sole responsibility of the CONTRACTOR . <br /> ( See also Section 01541 . ) <br /> ' B . Existing utility services : Notify applicable utility company and obtain approval for <br /> terminating existing utility services . <br /> ' 1 . Disconnect , seal , or cap utility services scheduled for demolition . Perform <br /> work in accordance with applicable utility company requirements . <br /> 2 . Identify utility service terminations on the project Record Documents . Place <br /> ' markers to indicate location of disconnected utility services below grade . <br /> C . Explosives : Use of explosives is not permitted . <br /> ' D . Scheduling : Carry out operations so as to avoid interference with OWNER's <br /> operations . <br /> E . Notification : At least 48 hours prior to commencement of a demolition or removal , <br /> notify ENGINEER in writing of proposed schedule . OWNER will inspect the existing <br /> ' equipment and mark for identification those items which are to remain the property <br /> of the OWNER . Do not start removals without the permission of the ENGINEER . <br /> ' F . Note that the County Code Enforcement Department has reported that large <br /> quantities of trash , junk , debris , etc , are present along and inside the proposed <br /> stormwater pond ' s north property line and also along and inside the north property <br /> t line of the land west of the stormwater pond site that will be cleared and grubbed in <br /> Alternate Bid Item No . 7 . 03 . <br /> ' 1 . 3 INSPECTION <br /> A . Examine the site . Verify extent of demolition work required and condition of the <br /> ifacilities scheduled for demolition . <br /> PART 3 - EXECUTION <br /> 3 . 1 DEMOLITION <br /> ' A . Pollution Controls : Use water sprinkling , temporary enclosures , and other suitable <br /> methods to limit the amount of dust and dirt rising and scattering in the air to the <br /> ' lowest practical level . Comply with governing regulations pertaining to <br /> environmental protection . <br /> 1 . Do not use water when it may create hazardous or objectionable conditions <br /> ' such as flooding or pollution . <br /> ' Last revised 3/ 10/03 02040-2 EAST GIFFORD <br /> RIPublic Works\Keithmstorm ester Projects\Gifford East\Construction Contract\Technical Specifications\Final Specifications\Division <br /> 2\02040 - Demolibons.doc <br />