My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-291
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-291
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2016 9:58:09 AM
Creation date
9/30/2015 8:26:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
11/16/2004
Control Number
2004-291
Agenda Item Number
11.I.2
Entity Name
Ecotech Consultants Inc.
Subject
Wetland Operation and Maintenance Contract Agreement
Work Order No.1
Area
North County Brine Disposal
Archived Roll/Disk#
3224
Supplemental fields
SmeadsoftID
4736
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ETC will meet with USACOE staff on- site to inspect surface water and vegetation conditions . ETC <br /> will conduct a pre-application meeting with USACOE staff in the Merritt Island office, and will meet <br /> one additional time with USACOE staff in the Merritt Island office to discuss the ERP application, <br /> if necessary. <br /> ETC will assist the County with preparation of responses to requests for additional information <br /> (RAI) letters received from the USACOE for the ERP application . This assistance shall be limited <br /> to two USACOE RAI letters . <br /> Task 8 . Consumptive Use Permit <br /> ETC will assist the County with the preparation of the consumptive use permit (CUP ) application . <br /> One copy of the draft application will be provided to the County for review . ETC will modify the <br /> draft application as appropriate in response to comments received from the County, after the County <br /> completes their review of the draft application . ETC will provide the County with one copy of the <br /> CUP application for review and signature . The County shall be responsible for all permit fees <br /> associated with the CUP . <br /> ETC will meet with St . Johns River Water Management District (District) staff on- site to inspect <br /> surface water conditions . ETC will conduct a pre- application meeting with District staff in the Palm <br /> Bay office . <br /> ETC will assist the County with preparation of responses to requests for additional information <br /> (RAI) letters received from the District for the CUP application . This assistance shall be limited to <br /> two District RAI letters . <br /> Task 9 . Transmission Pipeline Permit Assistance <br /> ETC w ill a ssist t he C ounty w ith t he p reparation o f t he F lorida D epartment o f E nvironmental <br /> Protection (FDEP) construction permit application for the transmission pipeline from the Bent Pine <br /> RIB Site to the wetland site . Specifically, this assistance will be limited to issues relating to <br /> wetlands , wildlife, the County arbor ordinance, and historic and archaeological resources . This <br /> information will be provided to the County to be included in the FDEP construction permit <br /> application for the pipeline . <br /> One draft copy of this information will be provided to the County for review . ETC will modify the <br /> environmental information as appropriate in response to comments received from the County, after <br /> the County completes their review of the information . ETC will provide the County with one copy <br /> (hard copy and electronic format) ofthe environmental information . The County shall be responsible <br /> for all permit fees associated with this permit . <br />
The URL can be used to link to this page
Your browser does not support the video tag.