My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-291
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-291
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2016 9:58:09 AM
Creation date
9/30/2015 8:26:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
11/16/2004
Control Number
2004-291
Agenda Item Number
11.I.2
Entity Name
Ecotech Consultants Inc.
Subject
Wetland Operation and Maintenance Contract Agreement
Work Order No.1
Area
North County Brine Disposal
Archived Roll/Disk#
3224
Supplemental fields
SmeadsoftID
4736
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ETC will meet with County, FDEP and U . S . Army Corps of Engineers (USACOE) staff on- site to <br /> inspect the environmental site conditions along the pipeline route . <br /> ETC will assist the County with preparation of responses to requests for additional information <br /> (RAI) letters received from the County, FDEP and the USACOE as they relate to the environmental <br /> information within this permit application . This assistance shall be limited to two FDEP RAI letters . <br /> Task 10. Indian River County Permit Assistance <br /> ETC will assist the County with the site planning process . This assistance will include attending the <br /> Pre-application meeting, Technical Review Committee meetings , Planning and Zoning meetings , <br /> other meetings with the County Planning Department , public hearings , County Commission <br /> meetings , and the modification of the information collected, compiled, and prepared as part of tasks <br /> 1 through 9 as described above to address specific County development codes . This task will not <br /> include a pre and post stormwater analysis , or the preparation of any other stormwater management <br /> plans or permits . <br /> Task 11 . Construction Services <br /> ETC will assist the County during the construction phase of this project with the following issues : <br /> ❖ attend pre-construction meetings ; <br /> ❖ assist with management of the permits ; <br /> ❖ review Contractor submittals as these submittals pertain to environmental aspects of the <br /> permits or the wetland system ; <br /> ❖ attend monthly progress meetings ; <br /> ❖ assist County with review of Contractor invoices and change order requests as they pertain <br /> to the wetland system ; <br /> ❖ weekly inspection of the wetlands site ; <br /> ❖ assist the County with preparing a punch list based on as -built drawings provided by the <br /> Contractor; and <br /> ❖ assist the County with completion of project permits . <br />
The URL can be used to link to this page
Your browser does not support the video tag.