Laserfiche WebLink
5 <br /> 8 . F <br /> SECTION 00530 - EJCDC <br /> STANDARD FORM OF AGREEMENT <br /> BETWEEN OWNER AND CONTRACTOR <br /> ON THE BASIS OF A STIPULATED PRICE <br /> THIS AGREEMENT ("Agreement" or "Contract'), dated theLday of in the <br /> year 2008 by and between Indian River County, a politi I subdivision of the Sfate of Florida <br /> (hereinafter called OWNER) and Expertech Network Installation of Plantation, Florida <br /> (hereinafter called CONTRACTOR). <br /> OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth , <br /> agree as follows : <br /> ARTICLE 1 WORK <br /> CONTRACTOR as an independent contractor and not as an employee shall furnish and complete <br /> all of the necessary labor, material, and equipment to perform the work as specified or indicated in <br /> the Contract Documents . The work is generally described as follows: <br /> A. CONTRACTOR shall complete all work as specified or indicated in the Contract <br /> Documents. The work is generally described as follows which shall include, but is not <br /> necessarily limited to the following . <br /> Indian River County (IRC) proposes to construct potable water and <br /> wastewater improvements generally within the Florida Department of <br /> Transportation ( FDOT) right-of-way of State Road 60 (SR 60) between 66th <br /> Avenue and just west of 74th Avenue in Indian River County, Florida. The <br /> improvements are intended to replace and/or adjust existing water and <br /> wastewater systems in a manner that will eliminate potential conflicts <br /> between IRC's systems and future FDOT roadway improvements. The <br /> FDOT's roadway improvements are not included in the scope of work <br /> under this Contract. <br /> Water Main <br /> Potable water improvements will consist of approximately 6000 feet of new <br /> 16" PVC main along the north side of SR 60, two ( 2) 18" HDPE directional <br /> drilled water mains on the north side of SR 60, approximately 75 feet of <br /> new 12" PVC main on the south side of SR 60 and two (2) 14" HDPE <br /> directional drilled water mains crossing SR 60. <br /> The Contract requires new water mains to be connected to existing <br /> facilities at several locations and for existing systems to be replaced to be <br /> abandoned in accordance with the Contract specifications. The Contract <br /> requires that existing service to potable water users not be interrupted . <br /> Sewer Force Main <br /> Wastewater force main improvements generally require construction of <br /> horizontal and vertical adjustments to existing mains at various locations <br /> to eliminate conflicts with future roadway improvements to be completed <br /> under the FDOT's project. The Contract also includes a 10" HDPE <br /> 00530- 1 <br /> FAUtilitieslUTILITY - ENGINEERING1Projecls - Utility Construction Permits\lRC - SR 60 66th Ave. to 82nd Ave. Utility Conflict <br /> Resolutions UCP#30261Al - 00530 COMPLETED Agreement between Owner Contractor Rev 061807.doc <br />