Laserfiche WebLink
directional drilled <br />force main <br />across SR <br />60. The Contract requires that <br />existing service to <br />wastewater <br />users not be <br />interrupted. <br />Construction consists of, but is not limited to, utilities exploration, <br />coordination with any permitting agencies, trenching, dewatering, <br />installation of pipe with fittings and all appurtenances; valves, fire hydrant <br />assemblies; wet tap, restrainers, air release valves, line stops, soil <br />compaction, disinfection, testing, (includes providing temporary jumper or <br />another approved method for disinfection and flushing); road restoration; <br />sod; and traffic control. <br />ARTICLE 2 ENGINEER <br />The project has been designed by Masteller & Moler, Inc., hereinafter called ENGINEER, and who <br />is to act as OWNER'S representative, assume all duties and responsibilities and have the rights <br />and authority assigned to ENGINEER in the Contract Documents in connection with completion of <br />the work in accordance with the Contract Documents. <br />ARTICLE 3 CONTRACT TIME <br />3.1 The CONTRACTOR shall be substantially completed with the following timeframe <br />(a) Within 15 calendar days from effective date of Notice to Proceed, Contractor <br />shall complete the following tasks: <br />1. Obtain all necessary permits. <br />2. Receive approved shop drawings for all materials and equipment to be <br />utilized in the job. <br />3. Perform all photographic recording and documentation of conditions prior <br />to construction. <br />4. Locate all existing utilities in the area of work. <br />5. Submit and secure approval of shop drawings. <br />6. Mobilize all labor, equipment, and materials. <br />7. Deliver and store all equipment and materials to the job site. <br />8. Notify all utilities and other affected parties prior to initiating construction. <br />(b) From 16 calendar days to 90 calendar days from the effective date of Notice to <br />Proceed, the CONTRACTOR shall complete the following tasks: <br />1. Install all pipe and appurtenant items. <br />2. Perform all testing. <br />3. Restore all disturbed areas to their pre -construction condition. <br />4. Correct all deficiencies noted by Engineer. <br />Completion of all tasks outlined above (i.e., Subparagraphs a) and b) constitutes <br />Substantial Completion. <br />(b) From 91 calendar days to 120 calendar days from the effective date of Notice to <br />Proceed, the CONTRACTOR shall complete the following tasks: <br />00530-2 <br />FAUlilitieMUTILITY - ENGINEERING1Projects - Utility Construction PermitsllRC - SR 60 66th Ave. to 82nd Ave. Utility Conflict <br />Resolutions UCP#30261A1 - 00530 COMPLETED Agreement between Owner Contractor Rev 061807.doc <br />