My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-285
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-285
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2016 2:16:30 PM
Creation date
10/1/2015 12:57:36 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
11/03/2009
Control Number
2009-285
Agenda Item Number
12.I.2
Entity Name
Florida Department of Transportation
Subject
Maintenance Memorandum of Agreement District Four (4)
Landscape Maintenance
Area
SR 60
Supplemental fields
SmeadsoftID
7920
Document Relationships
2009-167
(Agenda)
Path:
\Resolutions\2000's\2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAINTENANCE PLAN <br /> Landscape Improvements <br /> Project State Road No (s) : 60 <br /> Project Limits : Just West of I-95 Interchange to just West of 82 "`' Ave . , MP 22 .389 to MP <br /> 23 .923 <br /> FM No(s) : 228628- 1 -52 -01 <br /> Maintaining Agency : Indian River County <br /> Date : May 21 , 2008 <br /> ------- -- ---- ------ ------ ----- ----- -- -- ------ ---- -- -- - --- ----- - ---- -- --------- <br /> I. General Maintenance Requirements and Recommendations : <br /> The purpose of a plan for landscape and irrigation maintenance practices is to allow the plant material <br /> on your project to thrive in a safe and vigorous manner while fulfilling their intended purpose and <br /> conserving our natural resources . Plantings shall be maintained to avoid potential roadway hazards <br /> and to provide required clear visibility, accessibility, clearance, and setbacks as set forth by Florida <br /> Department of Transportation (FDOT) governing standards and specifications : FDOT Design <br /> Standards, FDOT Plans Preparation Manual Vol. I, Chapter 2. 11 and FDOT Standard Specifications <br /> for Road and Bridge Construction as amended by contract documents ; and all other requirements set <br /> forth by the District 4 Operations Maintenance Engineer. The initial portion of the Maintenance Plan <br /> describes general maintenance requirements and recommendations . The concluding section is <br /> recommendations prepared by the Landscape Architect of Record specific to the attached approved <br /> plans . <br /> Watering Requirements : <br /> Watering is a critical concern regarding the maintenance of healthy plant material and for observing <br /> water conservation practices . The amount of water to apply at any one time varies with the weather, <br /> drainage conditions and water holding capacity of the soil . For plant materials that have been <br /> established, it is imperative that any mandated water restrictions be fully conformed to on FDOT <br /> roadways . <br /> Proper watering techniques should provide even and thorough water dispersal to wet the entire root <br /> zone , but not saturate the soil or over-spray onto travel lanes . <br /> Irrigation System : <br /> The Agency shall ensure there are no roadway overspray or irrigation activities during daytime hours <br /> (most notably "rush hour" traffic periods) . It is imperative the irrigation controller is properly set to <br /> run early enough that the watering process will be entirely completed before high traffic periods as <br /> well as adhere to mandated water restrictions . To ensure water conservation, the Agency shall <br /> monitor the system for water leaks and the rain sensors to ensure they are functioning properly so that <br /> the system shuts down when there is sufficient rainfall . <br /> Pagel of 4 5 /211 .008 <br /> I' :AP'RO11 :C'1' S-FDO 15201 'vlandscp\SR60w_MOA - 1'L: AN . doe <br />
The URL can be used to link to this page
Your browser does not support the video tag.