My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-169
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-169
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2016 12:00:10 PM
Creation date
9/30/2015 9:43:25 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Proposal
Approved Date
05/16/2006
Control Number
2006-169
Agenda Item Number
14.B.2.
Entity Name
GeoSyntec Consultants
Subject
Fee proposal for pump and treat system
Area
south Gifford Road Landfill
Supplemental fields
SmeadsoftID
5638
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GeoSyntec Consultants <br /> Mr. Tanhum Goldshmid <br /> Indian River County, Solid Waste Disposal District <br /> 25 April 2006 <br /> Page 3 <br /> Task 2 — Preliminary System Cleaning, Repairs, and Re-start <br /> Under this task, GeoSyntec will perform field activities related to P&T system <br /> cleaning and re-starting. The budget assumes that two GeoSyntec personnel will be on-site <br /> for two days to disassemble (as needed), clean (using a pressure washer), reassemble, make <br /> minor repairs to leaking system components, and re-start the P&T system with flow <br /> directed to the infiltration gallery. <br /> Task 3 — O&M Site Visits <br /> Under this task, GeoSyntec has included budget for one person to conduct a total of 16 <br /> site visits, including twelve monthly O&M site visits and four P&T system sampling site <br /> visits (weekly sampling visits to be conducted the first month) . O&M site visits will <br /> include system cleaning (cleaning air stripper diffusers, submersible pumps, probes, etc.), <br /> as appropriate, recording flow meter readings, pressure gauge readings, changing bag <br /> filters, and backwashing the GAC, if warranted. Immediately after system re-start, <br /> sampling visits will be conducted according to the schedule outlined in the source <br /> excavation report and subsequently approved by FDEP in a letter dated 29 December 2005 : <br /> Samples of influent, effluent, and post-carbon effluent are anticipated to be collected <br /> based on the following schedule: <br /> I) at re-start (24 hour turnaround time); <br /> 2) weekly.for the remainder of the first month; <br /> 3) monthly for the remainder of the first six months of operation; and <br /> 4) semi-annually thereafter. <br /> Samples will be submitted to a laboratory contracted directly with IRC; therefore, <br /> budget has not been included herein for laboratory analysis. <br /> XR06084/CCR060027 — IRC Pump and Treat System Fee Pmposal.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.