My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-188
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-188
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2016 11:50:03 AM
Creation date
9/30/2015 7:54:38 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/10/2004
Control Number
2004-188
Agenda Item Number
14.B.4
Entity Name
Fellsmere and Roseland Recycling Center Landscaping;Bid #6052
Archived Roll/Disk#
3223
Supplemental fields
SmeadsoftID
4221
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E . Resubmittals will be handled in the same manner as first submittals . On <br /> resubmittals the CONTRACTOR shall direct specific attention, in writing on the <br /> letter of transmittal and on resubmitted shop drawings by use of revision triangles <br /> or other similar methods , to revisions other than the corrections requested by the <br /> ENGINEER, on previous submissions . Any such revisions that are not clearly <br /> identified shall be made at the risk of the CONTRACTOR. The CONTRACTOR <br /> shall make corrections to any work done because of this type revision that is not <br /> in accordance to the Contract Documents as may be required by the ENGINEER. <br /> F . Partial submittals may not be reviewed . The ENGINEER will be the only judge as <br /> to the completeness of a submittal . Submittals not complete will be returned to the <br /> CONTRACTOR, and will be considered "Not Approved" until resubmitted . The <br /> ENGINEER may at his/her option provide a list or mark the submittal directing <br /> the CONTRACTOR to the areas that are incomplete . <br /> G . Repetitive Review <br /> 1 . Shop drawings and other submittals will be reviewed no more than twice <br /> at the OWNER's expense . All subsequent reviews will be performed at <br /> times convenient to the ENGINEER and at the CONTRACTOR' s <br /> expense, based on the ENGINEER's then prevailing rates . The <br /> CONTRACTOR shall reimburse the OWNER for all such fees invoiced to <br /> the OWNER by the ENGINEER. Submittals are required until approved. <br /> 2 . Any need for more than one resubmission, or any other delay in obtaining <br /> ENGINEER' s review of submittals , will not entitle CONTRACTOR to <br /> extension of the Contract Time . <br /> H . If the CONTRACTOR considers any correction indicated on the shop drawings to <br /> constitute a change to the Contract Documents , the CONTRACTOR shall give <br /> written notice thereof to the ENGINEER at least seven working days prior to <br /> release for manufacture . <br /> I. When the shop drawings have been completed to the satisfaction of the <br /> ENGINEER, the CONTRACTOR shall carry out the construction in accordance <br /> therewith and shall make no further changes therein except upon written <br /> instructions from the ENGINEER. <br /> 1 . 06 DISTRIBUTION <br /> A . Distribute reproductions of approved shop drawings and copies of approved <br /> product data and samples, where required, to the job site file and elsewhere as <br /> directed by the ENGINEER. Number of copies shall be as required by the <br /> ENGINEER but shall not exceed 6 . <br /> 1 . 07 CONSTRUCTION PHOTOGRAPHS <br /> A . The CONTRACTOR shall have met the provisions of Division 1 . <br /> B . The film negatives shall be retained in the files of the CONTRACTOR until the <br /> completion of the project and shall then be turned over to the OWNER . <br /> 6706-38666\2/ 5 /04 Page 23 of 59 VRB <br />
The URL can be used to link to this page
Your browser does not support the video tag.