My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-147
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-147
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2016 1:53:01 PM
Creation date
10/1/2015 12:09:40 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/13/2008
Control Number
2008-147
Agenda Item Number
8.F.
Entity Name
Masteller, Moler, Reed & Taylor
Subject
Work Order No.4 CR 512 Phase V
Area
I-95 to Broadway St. Fellsmere
Project Number
0445
Supplemental fields
SmeadsoftID
7013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
n � • r > <br /> Y��R 1• <br /> Board of County Commissioners <br /> Administration - Building A (South) <br /> 1801 27th Street <br /> Vero Beach, Florida 32960 <br /> Telephone : (772) 567-8000 FAX : 772-778-9391 <br /> Project: <br /> CR512 Phase V Roadway, Planning & Design Topographic Survey. <br /> From — Phase IV (1 -95) to Broadway Street (City of Fellsmere) <br /> Project No. 0445 <br /> WORK ORDER NO . 4 ( Engineering/Surveying ) <br /> FOR <br /> PROFESSIONAL SERVICES AGREEMENT <br /> ANNUAL SURVEYING and MAPPING/GIS SERVICES <br /> WITH <br /> Masteller, Moler, Reed & Taylor, Inc. <br /> In accordance with Contract No. 0725 2007-2009 <br /> This Work Order No. 4 is in accordance with the existing AGREEMENT dated November 6`", 2007 <br /> between Masteller, Moler, Reed & Taylor, Inc. (SURVEYOR) and Indian River County (COUNTY) . <br /> This Work Order No. 4 amends the agreement as follows : <br /> SECTION I — PROJECT LIMITS <br /> Begin at the terminus of the County Road 512 Phase IV project east of 1 -95 (currently under <br /> construction) , traveling west on County Road 512 through the intersection at North Broadway <br /> Street in the City of Fellsmere . Length is approximately 3 miles. <br /> (Reference attached project limits map) <br /> This Work Order No. 4 is for the SURVEYOR to perform an updated Topographic survey for <br /> engineering planning and design purposes of County Road 512 Phase V from the termination <br /> point of County Road 512 Phase IV to approximately 1000 feet west of Broadway Street in the City <br /> of Fellsmere, all lying in Indian River County, Florida. The original survey was performed under the <br /> prior Work Order dated January 2005 between Masteller, Moler, Reed & Taylor, Inc. (SURVEYOR) <br /> and Indian River County (COUNTY) . <br />
The URL can be used to link to this page
Your browser does not support the video tag.