My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-147
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-147
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2026 12:09:16 PM
Creation date
10/1/2015 12:09:40 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/13/2008
Control Number
2008-147
Agenda Item Number
8.F.
Entity Name
Masteller, Moler, Reed & Taylor
Subject
Work Order No.4 CR 512 Phase V
Area
I-95 to Broadway St. Fellsmere
Project Number
0445
Supplemental fields
SmeadsoftID
7013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
n 'r,- <br />Board <br />r- <br />Board of County Commissioners <br />Administration - Building A (South) <br />1801 27th Street <br />Vero Beach, Florida 32960 <br />Telephone: (772) 567-8000 FAX: 772-778-9391 <br />Project: <br />CR512 Phase V Roadway, Planning & Design Topographic Survey. <br />From — Phase IV (1-95) to Broadway Street (City of Fellsmere) <br />Project No. 0445 <br />WORK ORDER NO. 4 (Engineering/Surveying) <br />FOR <br />PROFESSIONAL SERVICES AGREEMENT <br />ANNUAL SURVEYING and MAPPING/GIS SERVICES <br />WITH <br />Masteller, Moler, Reed & Taylor, Inc. <br />In accordance with Contract No. 0725 2007-2009 <br />This Work Order No. 4 is in accordance with the existing AGREEMENT dated November 6`", 2007 <br />between Masteller, Moler, Reed & Taylor, Inc. (SURVEYOR) and Indian River County (COUNTY). <br />This Work Order No. 4 amends the agreement as follows: <br />SECTION I — PROJECT LIMITS <br />Begin at the terminus of the County Road 512 Phase IV project east of 1 -95 (currently under <br />construction), traveling west on County Road 512 through the intersection at North Broadway <br />Street in the City of Fellsmere. Length is approximately 3 miles. <br />(Reference attached project limits map) <br />This Work Order No. 4 is for the SURVEYOR to perform an updated Topographic survey for <br />engineering planning and design purposes of County Road 512 Phase V from the termination <br />point of County Road 512 Phase IV to approximately 1000 feet west of Broadway Street in the City <br />of Fellsmere, all lying in Indian River County, Florida. The original survey was performed under the <br />prior Work Order dated January 2005 between Masteller, Moler, Reed & Taylor, Inc. (SURVEYOR) <br />and Indian River County (COUNTY). <br />
The URL can be used to link to this page
Your browser does not support the video tag.