Laserfiche WebLink
IRC Work Order #4 <br /> County Road 512 Ph. 5 <br /> Topo Survey <br /> May 1 , 2008 <br /> Page 2 of 7 <br /> SECTION 11 - SCOPE OF SERVICES <br /> As agreed upon between Masteller, Moler, Reed & Taylor, Inc. and Indian River County, the <br /> SURVEYOR shall provide Professional Land Surveying services to complete all tasks as outlined <br /> in this Work Order No. 4 described as follows : <br /> • Updated Route Survey. <br /> 1 . LIMITS : Update existing route survey, 1 -95 to Willow Street, last updated in 2005 , AND extend <br /> project approximately 1000' west of the Broadway Street Intersection . <br /> 2. Main CR512 Corridor: Perform - update topographic (route) survey of the CR512 phase V <br /> corridor, route limits to include verification and/or survey of elevations, grade breaks (I . E . visible <br /> high - low points) , driveways, all visible utilities and drainage features and inverts (As-Builts) <br /> within 200' feet and beyond existing right of way <br /> • Buildings and/or building fronts and Finish Floors (low floor) along main corridor are to be <br /> obtained within 100' feet of existing right-of-way. <br /> 3. Side Streets : Perform route survey of all side streets 500' feet beyond existing CR512 right of <br /> way, and up to the existing building frontage or 50' feet beyond the existing side street right-of- <br /> way, to include verification and/or survey of elevations , grade breaks, driveways, all visible <br /> utilities and drainage features and inverts (As-Builts) within 50' feet and beyond existing right of <br /> way. <br /> • Buildings and/or building fronts and Finish Floors (low floor) along side streets are to be <br /> obtained within 50' feet of existing right-of-way. <br /> • Survey shall provide all Rights-of- Ways, jurisdictional lines and property and/or parcel lines as <br /> they intersect or affect the corridor(s) . Property lines shall be confirmed and mapped utilizing <br /> sufficient land corner locations and/or deed interpretations. <br /> 4. Recover existing vertical and horizontal control and reestablish as necessary. Survey baseline <br /> will be referenced to State Plane Coordinates, North American Datum 1983/90 , Florida East <br /> Zone. Elevations shall be referenced to the National Geodetic Vertical Datum of 1929. <br /> 5. Extend existing baseline of survey to 1000 feet west of Broadway Street, monument and set <br /> reference points as required in original work order. <br /> 6. Recover existing monumentation along extended route and locate as necessary. <br /> 7 . Perform cross sections at 100' foot intervals and/or change in grade (I . E . visible high-Low <br /> points) along the extended route and side streets. <br /> 8 . Provide Flood Zone lines and/or areas as per the current FEMA Flood Rate Maps . <br /> 9. This survey will not include any trees, vegetation or vegetation lines or areas of environmental <br /> concern. <br /> 10. Update existing Base Plan sheets of existing survey and above described additional data <br /> depicting all topography, features , baseline, R/W, cross sections and adjacent parcel <br /> information. <br />