My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-152 A
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-152 A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2016 1:44:57 PM
Creation date
10/1/2015 12:59:06 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Memorandum of Understanding
Approved Date
05/13/2008
Control Number
2008-152A
Agenda Item Number
10.A.1
Entity Name
City of Fellsmere Florida Communities Trust
Subject
Memorandum of Understanding Exhibit A & B
Fellsmere Trailhead Preserve Site
Area
NW Corner of I-95 and CR 512
Supplemental fields
SmeadsoftID
7984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION I - INTRODUCTION <br /> The City of Fellsmere and Indian River County are individually and collectively furthering the directives <br /> adopted in both of their Comprehensive Master Plans by acquiring the Fellsmere Trailhead Preserve, a vacant <br /> 88 . 5 acre site for natural resource protection, passive outdoor recreational and a trailhead facility. The Preserve <br /> will provide outdoor recreational facilities and services to the adjacent 22 ,000 acre St. Sebastian State Buffer <br /> Preserve and the County ' s future Rail Trail Greenway multi-use Greenway recreational trail running east to <br /> west close to the center of the Project site. The Greenway trail will safely provide public access to the C- 54 <br /> Primary Drainage Canal , the St. Sebastian River and the Buffer Preserve surrounding the Preserve on the north <br /> and west sides . The proposed Trailhead/Welcome Station will be located adjacent to the paved County Road <br /> 512 . The facility will be designed and managed to enhance the public 's access to the environmentally sensitive <br /> natural resources located in both the Buffer Preserve and Fellsmere 's new Park Preserve. <br /> Location and Ownership <br /> The Project site is generally located in unincorporated Indian River County. A small portion of the Project Site <br /> is located in the City' s Fellsmere 's Geographic Boundary and is identified to be located in the eastern portion of <br /> the City's Community Redevelopment District. The project site is located at the northwest quadrant of the I-95 <br /> and CR 512 Interchange surrounded by the St. Sebastian River Preserve State Park which borders the Project <br /> Site 's northern and western property lines . The vacant land around the other 3 quadrants of I-95 and Highway <br /> 512 Interchange is being developed into a built-up planned commercial and residential area. <br /> The project site is also located at the primary entrance into the center of the City of Fellsmere to the west and <br /> the Sebastian inlet is located to the east. (See Exhibit A) <br /> The Project Site 's Land Use and Zoning Regulations permits commercial use on the Project Site . It has been <br /> designated by FEMA to be in Flood Zones "A" & "X". New public water, sewer and sidewalks are being <br /> constructed at the southeastern boundary of the Project site along County Road 512 . Directly south of the <br /> project site, a three story hotel , retail shops and gas station is being constructed on eight acres of land. <br /> The <br /> Owner of the eight acre site was required during the permitting process to set aside 1 . 5 acres of land for Natural <br /> Preservation and Conservation purposes . The Owner has agreed to donate the designated Conservation area to <br /> the City of Fellsmere provided it is environmentally integrated into the City ' s proposed Preserve. <br /> A 3 , 500 acre DRI located at the south west quadrant of the I-95 and CR 512 Interchange is under review for <br /> governmental permitting. <br /> The Project Site is currently owned by two private parties . One party owns 5 acres located towards the center <br /> of the site and contiguous with the old Trans Florida Railroad ROW running east to west. The other party, a <br /> single property owner, controls the 82 . 1 acres of land located on both sides of the 5 acre ROW described above. <br /> Upon the Project Site 's transfer of title to the City of Fellsmere, the 1 . 5 acre Conservation Easement will also be <br /> transferred to the City for a total of 88 .6 acres comprising the Fellsmere Preserve Park. <br /> Background Information <br /> The project site is located within a Strategic Habitat Conservation Area (SHCA) . (FCT review Comment #2). <br /> The City of Fellsmere, with the assistance of Indian River County, is primarily interested in the conservation <br /> and outdoor recreational enhancement to the 88 .6 acres of land due to its unique location adjacent to the 22 ,000 <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.