My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-136
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-136
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2016 10:51:23 AM
Creation date
9/30/2015 10:44:00 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
First Amendment
Approved Date
04/17/2007
Control Number
2007-136
Agenda Item Number
7.T.
Entity Name
Great Lakes Dredge and Dock Co.
Subject
Beach Restoration - Sectors 1,2, 7 Ambersand Beach
First Amendment to Agreement
Area
Ambersand Beach
Project Number
0502
Bid Number
2006047
Supplemental fields
SmeadsoftID
6262
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ Unland Source Sand — Sand that is obtained from a terrestrial source (sand mine) <br /> landward of the Coastal Construction Control Line and delivered to beach by truck haul. <br /> 6. CONTRACTOR EXPERIENCE <br /> 6. 1 The Information required of Bidders includes General Information and a Plant and <br /> Equipment Schedule. These forms shall be completed by the CONTRACTOR and <br /> submitted with the bid. The project experience specified in the General Information forms <br /> shall include the fill volume for each project and preferably include projects constructed in <br /> the state of Florida. <br /> 7. PRE-CONSTRUCTION MEETING <br /> After Contract Award and before construction operations are initiated, the COUNTY shall notify the <br /> CONTRACTOR of the date and time for a mandatory Pre-Construction Meeting. The meeting shall <br /> be audio taped. The purpose of the meeting shall be to develop mutual understanding relative to <br /> details of the project, including the Quality Assurance Plan (as described in Section 40) all <br /> documentation requirements included in the Contractor' s Daily Quality Control Report, daily <br /> administration of the program, and the working relationship between the CONTRACTOR and the <br /> COUNTY including any consultant(s) working for the COUNTY. The COUNTY shall review with <br /> the CONTRACTOR the Plans and Technical Specifications, submissions identified in Section 8 of <br /> these Technical Specifications, permit requirements, lines of contractual and administrative <br /> authority, daily reporting requirements, submittals schedule and construction methods. A letter of <br /> record shall be written by the COUNTY documenting all items discussed at the meeting and a copy <br /> will be provided to the CONTRACTOR. Subsequent meetings may be scheduled to reconfirm <br /> mutual understanding immediately prior to the construction or during construction. <br /> 8 . REQUIRED SUBMISSIONS <br /> A minimum of seven (7) days prior to the Pre-Construction Meeting, the CONTRACTOR shall <br /> submit the following items for review and approval by the COUNTY: <br /> TECHNICAL AND ENVIRONMENTAL SPECIFICATIONS _ TS-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.