Laserfiche WebLink
CONTRACTOR shall _ <br /> conduct turbidity monitoring every six (6) hours during <br /> pumping operations, upland sand is placed/graded on the <br /> beach below the MVM line, or any other in-water work, with <br /> the first sample taken within I hour following <br /> commencement of said activity, and additionally whenever <br /> excessive turbidity plumes or pipeline leaks are observed or <br /> reported. The CONTRACTOR shall collect Background and <br /> Compliance samples for the beach nourishment site. The <br /> Background turbidity sample shall be collected at a point <br /> approximately 150 meters (492 feet) offshore, -rf 500 meters <br /> ( 1 ,640 feet) up-current from the discharge point <br /> v , where upland sand is placed/graded <br /> below the MHW line, or any other in-water work. The <br /> Background sample shall be collected clearly outside of any <br /> project-induced turbidity plume, and shall be collected at <br /> mid-depth. The Compliance turbidity sample shall be <br /> collected at a point no more than 120 meters (394 feet) <br /> offshore, and no more than 1 ,000 meters (3 ,281 feet) down- <br /> current from the discharge point, where upland sand is <br /> placed/graded below the MHW line, or any other in-water <br /> work. The Compliance sample shall be collected within the <br /> densest portion of any visible turbidity plume, and shall be <br /> collected from the surface and at mid-depth. <br /> 13 . 1 . 1 .3 Turbidity Reporting. The CONTRACTOR shall <br /> complete the Turbidity Monitoring Report that is provided <br /> in Appendix F of the Contract Documents and the CONTRACTOR shall <br /> submit the r, Turbidity Monitoring Reports to the COUNTY <br /> daily with the Contractor' s Daily Quality Control Report as described in <br /> Section 12 of these Technical Specifications. The turbidity data shall be <br /> reported in Nephelometric Turbidity Units (NTUs). The <br /> CONTRACTOR shall provide the following: a statement describing the <br /> methods used in collection, handling, storage, and analysis of the <br /> samples; a map indicating the sampling locations; a statement by the <br /> individual responsible for the implementation of the sampling program <br /> concerning the authenticity, precision, limits of detection and accuracy of <br /> the data; the times of the day that the samples were collected; the total <br /> water depths at each of the sampling locations; the depth at which each <br /> sample was collected; the weather conditions just prior to the sample <br /> (e.g. , precipitation, cloud cover, temperature, and wind speed and <br /> direction); the tidal stage and direction of flow; and, wave height. <br /> 13 . 1 . 1 .4 Excessive Turbidity. In the event that the Compliance turbidity samples <br /> exceed the Background turbidity samples by 29 NTUs <br /> TECHNICAL AND ENVIRONMENTAL SPECIFICATIONSTS- 10 <br />