My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-136
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-136
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2016 10:51:23 AM
Creation date
9/30/2015 10:44:00 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
First Amendment
Approved Date
04/17/2007
Control Number
2007-136
Agenda Item Number
7.T.
Entity Name
Great Lakes Dredge and Dock Co.
Subject
Beach Restoration - Sectors 1,2, 7 Ambersand Beach
First Amendment to Agreement
Area
Ambersand Beach
Project Number
0502
Bid Number
2006047
Supplemental fields
SmeadsoftID
6262
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTRACTOR shall _ <br /> conduct turbidity monitoring every six (6) hours during <br /> pumping operations, upland sand is placed/graded on the <br /> beach below the MVM line, or any other in-water work, with <br /> the first sample taken within I hour following <br /> commencement of said activity, and additionally whenever <br /> excessive turbidity plumes or pipeline leaks are observed or <br /> reported. The CONTRACTOR shall collect Background and <br /> Compliance samples for the beach nourishment site. The <br /> Background turbidity sample shall be collected at a point <br /> approximately 150 meters (492 feet) offshore, -rf 500 meters <br /> ( 1 ,640 feet) up-current from the discharge point <br /> v , where upland sand is placed/graded <br /> below the MHW line, or any other in-water work. The <br /> Background sample shall be collected clearly outside of any <br /> project-induced turbidity plume, and shall be collected at <br /> mid-depth. The Compliance turbidity sample shall be <br /> collected at a point no more than 120 meters (394 feet) <br /> offshore, and no more than 1 ,000 meters (3 ,281 feet) down- <br /> current from the discharge point, where upland sand is <br /> placed/graded below the MHW line, or any other in-water <br /> work. The Compliance sample shall be collected within the <br /> densest portion of any visible turbidity plume, and shall be <br /> collected from the surface and at mid-depth. <br /> 13 . 1 . 1 .3 Turbidity Reporting. The CONTRACTOR shall <br /> complete the Turbidity Monitoring Report that is provided <br /> in Appendix F of the Contract Documents and the CONTRACTOR shall <br /> submit the r, Turbidity Monitoring Reports to the COUNTY <br /> daily with the Contractor' s Daily Quality Control Report as described in <br /> Section 12 of these Technical Specifications. The turbidity data shall be <br /> reported in Nephelometric Turbidity Units (NTUs). The <br /> CONTRACTOR shall provide the following: a statement describing the <br /> methods used in collection, handling, storage, and analysis of the <br /> samples; a map indicating the sampling locations; a statement by the <br /> individual responsible for the implementation of the sampling program <br /> concerning the authenticity, precision, limits of detection and accuracy of <br /> the data; the times of the day that the samples were collected; the total <br /> water depths at each of the sampling locations; the depth at which each <br /> sample was collected; the weather conditions just prior to the sample <br /> (e.g. , precipitation, cloud cover, temperature, and wind speed and <br /> direction); the tidal stage and direction of flow; and, wave height. <br /> 13 . 1 . 1 .4 Excessive Turbidity. In the event that the Compliance turbidity samples <br /> exceed the Background turbidity samples by 29 NTUs <br /> TECHNICAL AND ENVIRONMENTAL SPECIFICATIONSTS- 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.