Laserfiche WebLink
The CONTRACTOR shall notify the COUNTY in writing one ( 1 ) day in advance of the <br /> mobilization of each piece of floating equipment. Mobilization into the work area shall be <br /> through the corridor limits shown in the Plans. No anchors shall be deployed outside the <br /> work area. All floating equipment shall be self-propelled or directly pushed when <br /> landward of the —200 foot NGVD contour line. The CONTRACTOR shall monitor the <br /> location of each piece of floating equipment mobilized through the use of horizontal <br /> positioning equipment which has an accuracy of at least + 3 feet. Position data shall be <br /> recorded every - A copy of the data and plots shall be <br /> provided to the COUNTY daily in the Contractor's Daily Quality Control Report <br /> (Appendix G). If any floating equipment (barges, pipe strings, dredges, etc), other than <br /> self-propelled vessels (tugs, survey boats, crew boats, etc), leaves the project area and is <br /> remobilized into the borrow area, these mobilization procedures shall be repeated. <br /> 27.2 Demobilization. Demobilization shall be according to the same requirements for <br /> mobilization specified in Section 27 . 1 . <br /> 28 . EQUIPMENT POSITIONING AND CUT DEPTH MONITORING <br /> Accuracy and Precision. The CONTRACTOR shall have equipment on the dredge that <br /> continuously measures the vertical and horizontal location of the cutterhead, drag arms, <br /> dustpan, or clamshell and is interfaced with the cut depth positioning equipment. The <br /> specifications for this equipment, calibration information, and limits of accuracy are to be <br /> provided to the COUNTY. The COUNTY will approve or reject use of specific equipment <br /> based on accuracy. Horizontal accuracy for dredge positioning shall be within +3 feet. <br /> Vertical accuracy for dredge depth positioning shall be within + 1 . 0 foot. This equipment <br /> shall provide a permanent record of the equipment' s position referenced to State Plane <br /> Coordinates (NAD 83 , Florida East Zone) and NGVD 29 datum. <br /> During dredging, reports on the position (x,y) of and bottom elevation (z) of the cutterhead, <br /> drag arms, dustpan or clamshell shall be provided. This position shall give both horizontal <br /> (in State Plane Coordinates, NAD 83 , Florida East Zone datum) and vertical (depth <br /> corrected for tide in feet referenced to NGVD 29 datum) position. The dredge depth <br /> (cutterhead, dragheads, or dustpan) shall be corrected for tidal fluctuations by a method <br /> pre-approved and acceptable to the ENGINEER. The tide measurements must be acquired <br /> and applied to the vertical control equipment on a real-time or hourly basis. At a minimum <br /> the report shall give the location at 30 second intervals for cutterhead, hopper, clamshell or <br /> dustpan dredges. During unloading of hopper dredges and scows, data shall be collected at <br /> the time of the beginning of the unloading and immediately prior to departure to the borrow <br /> area. The CONTRACTOR shall also submit an ASCII file and a plot of the horizontal <br /> positions of the dredge for each day. The plot shall show the borrow area and dredge area <br /> limits, the dredge position, a north arrow and the Florida State Plane grid. The plot shall <br /> contain numbered position fixes that correspond to the positions discussed above. The <br /> previous day's data shall be provided to the COUNTY daily as part of the Contractor' s <br /> Daily Quality Control Report (Appendix G). The location on the dredge of the positioning <br /> system antenna and the distance and direction from the positioning system antenna to the <br /> TECHNICAL AND ENVIRONMENTAL SPECIFICATIONS � ' . _ 'r TS-26 <br />