Laserfiche WebLink
bottom of the cutterhead, drag arms, dustpan, or clamshell shall be reported on the first <br /> Contractor' s Daily Quality Control Report. <br /> 28 . 1 Work Areas and Exclusion Areas . The Plans identify a Deepwater Access Corridor to the <br /> Borrow Area to be used for all equipment moving into or out of the area. The Plans specify <br /> a work area where spudding and anchoring are permitted and exclusion areas which are not <br /> to be used for transit, anchoring, dredging or any other vessel activity. Pipeline routes are <br /> discussed in Section 29.2 of these Specifications. <br /> 29 . TRANSPORT OF EXCAVATED MATERIALS <br /> 29. 1 Methods of Transport. The method of transporting the fill from the borrow area to the <br /> placement area shall be proposed by the CONTRACTOR at the time of the bid. The <br /> method of transport shall be the CONTRACTOR' S decision, however, the method must <br /> comply with all permits, production volume requirements, and environmental <br /> specifications . Trucking fill on the beach shall be allowed if fill placed above mean high <br /> water is compacted mechanically with methods approved by the COUNTY, or if the <br /> CONTRACTOR places an additional 10% of the quantity specified by the construction <br /> template at no additional cost to the COUNTY to compensate for the loosely packed sand <br /> ("fluff') that results from dry placement. Upland sand source bidders must submit <br /> documentation that the proposed sand source meets the mean grain size, percent fines, and <br /> other characteristics of the offshore borrow material identified in these documents. <br /> 29. 2 Pipeline Method. All pipelines shall be submerged except at the dredge, mono-buoy, <br /> and/or boosters. The CONTRACTOR shall propose location(s) of the submerged pipeline <br /> that must be approved by the COUNTY prior to submerging the pipeline. The <br /> CONTRACTOR shall avoid hardbottom or reef locations in the proposed pipeline route <br /> and shall provide a plan view drawing clearly indicating the route relative to the known <br /> locations of reeflhardbottom and the Work and Exclusion Areas specified in the Plans. The <br /> CONTRACTOR shall be required to place collars on the pipeline in the locations where <br /> pipeline contact with the hardbottom is possible. The COUNTY shall provide the <br /> CONTRACTOR a map of the hardbottom located in the vicinity of the placement area <br /> landward of the —20 ft NGVD contour prior to CONTRACTOR-proposed designated <br /> pipeline access corridor route(s) . Subsequent to submerging of the pipeline, the <br /> CONTRACTOR shall provide as-built drawings showing the actual position of the <br /> pipeline. <br /> The CONTRACTOR shall maintain a tight discharge pipeline at all times. The joints shall <br /> be constructed to preclude spillage and leakage. Leaks shall be promptly repaired and the <br /> dredge shall be shut down until complete repair has been made to the satisfaction of the <br /> COUNTY. The CONTRACTOR shall transport the COUNTY to the leak repair site for <br /> visual inspection if so requested by the COUNTY . <br /> 29.3 Hopper Dredge Method. If the material is transported by hopper dredge or scows, then all <br /> scows and vessels must be kept in good condition, the coamings repaired and the pockets <br /> provided with proper doors or appliances to prevent leakage of material. Overflow at the <br /> TECHNICAL AND ENVIRONMENTAL SPECIFICATIONS11 1 -27 <br />