Laserfiche WebLink
with the minimum Technical Standards for land surveyors in the State of Florida pursuant <br /> to Florida Statute 472 .027 adopted rule 121 HH-6. All surveys submitted to the COUNTY <br /> shall bear the surveyor's signature and seal. <br /> 34. 10 Costs. All costs associated with surveying shall be included in the survey bid item. <br /> 35 . USE OF UPLAND SAND SOURCES <br /> The CONTRACTOR may propose an upland sand source and truck hauling for the project. Upland <br /> sand source bidders must submit documentation that the proposed sand source meets the mean grain <br /> size, percent fines, and other characteristics of the offshore borrow material identified in these <br /> documents . Use of a source material with a grain size less than the mean grain size of the offshore <br /> sand source is not acceptable. Use of material not closely compatible (as specified by the <br /> ENGINEER) with the existing beach sand or offshore borrow site is not acceptable. The <br /> CONTRACTOR must propose adequate measures to ensure that large shell and rock debris is <br /> adequately screened from the source material and must provide a Quality Assurance program to <br /> ensure the quality of the source material. <br /> Any upland source material proposed shall be free from construction debris, rocks, clay or other <br /> foreign matter, and shall be obtained from a source landward of the Coastal Construction Control <br /> Line or from a source authorized pursuant to Section 161 .041 , Florida State Statutes. <br /> The CONTRACTOR shall submit a representative sample ( 15 in3f) of the proposed sand with his <br /> bid within a sealed, air-tight container orbag with a certified independent testing laboratory analysis <br /> results report. The report to be submitted with the CONTRACTOR' S bid shall include: <br /> (a) Grain size distribution graph <br /> (b) Carbonate fraction <br /> (c) Grain size analysis (including mean grain size, sorting and percent fines) <br /> The CONTRACTOR will also submit with the bid a report identifying the specific stockpile(s) <br /> and/or site(s) to be used for the project, and an estimate of the volume of sand available from each <br /> stockpile or source. Upon request, Contractor shall arrange for County staff to inspect the <br /> stockpile(s) and/or source(s) before submitting bid. <br /> The following sections of these Technical Specifications will not apply to upland sand source bids: <br /> 8 .6, 8 . 11 , 13 . 1 . 1 .2 . 1 , 13 . 1 .4, 13 .2 .2 .2. 6, 13 .2.2 . 3 . 1 , 1 % 21 , 24, 28, 31 .3, 31 . 7, 33 , and 46. All other <br /> Technical Specifications herein apply to all bids. <br /> 36. PAYMENT FOR MOBILIZATION <br /> Mobilization includes but is not limited to those operations as defined in Section 5 . 8 and as further <br /> described in Section 27. 1 of these Technical Specifications. The costs of bonds, required insurance <br /> and any other pre-construction expense necessary for the start of the work, excluding the cost of <br /> construction materials, shall also be included in this line item. <br /> TECHNICAL AND ENVIRONMENTAL SPECIFICATIONS 1 _ " TS-35 <br />