39.4 Maximum Pay Volume. The COUNTY shall revise the design template shown on the <br /> Contract Drawings (based on October 2004 survey data) to reflect the CONTRACTOR' S <br /> pre-construction survey. The COUNTY shall provide a table of maximum pay volume to <br /> the CONTRACTOR within seven (7) days of receipt of survey data. The table shall be <br /> enumerated according to the pay profile (R-9 to 9.5. R- 10 to 10.6, etc .). A tolerance of <br /> +0. 5 feet (Section 31 .5) is provided to accommodate inaccuracies and variability in the <br /> construction and measurement of the design grade. The maximum pay volume shall be <br /> calculated using the average-end area method. However, the CONTRACTOR shall not <br /> intentionally fill above the design template. <br /> 39 . 5 Pay Profiles. All pay profiles are contained in the plans and specifications for the project. <br /> UNDER NO CIRCUMSTANCES WILL PROFILES, OTHER THAN THOSE <br /> PROVIDED IN THE PLANS AND SPECIFICATIONS, BE CONSIDERED FOR <br /> PAYMENT PURPOSES . The pay profile lines to be used for payment will be the 26 <br /> profile monument locations between R-4 and T- 17, inclusive for Sectors 1 & 2 and R-97 <br /> through R- 108 for Sector 7. The ENGINEER and the COUNTY have designated the pay <br /> profiles, as shown on the Plans, and will not review or consider any other profiles than <br /> those shown on the Plans . The CONTRACTOR accepts and acknowledges that no <br /> discussion, arbitration, negotiation, or any other legal procedures will be employed by the <br /> CONTRACTOR or any of his agents in an attempt to force consideration of any other <br /> profiles for payment purposes other than those identified in the plans and specifications . <br /> The ENGINEER shall have final decision regarding any and all issues related to pay <br /> profiles, pay volumes and any other issues pertaining to the project construction. Any <br /> questions of fulfillment of the said specifications, or plans, shall be decided by the <br /> ENGINEER, and said work shall be done in accordance with the ENGINEER'S <br /> interpretations of the meanings of the words, terms, clauses, drawings or any other <br /> document defining the character of the work. <br /> 40. QUALITY ASSURANCE <br /> The CONTRACTOR shall be solely responsible for assuring the quality of all work conducted by <br /> the CONTRACTOR or their subcontractors in association with the contract for this project. The <br /> CONTRACTOR shall designate a Quality Assurance (QA) Officer for this contract, and the QA <br /> Officer shall assume responsibility for compliance with all requirements of this contract including <br /> permit conditions, easements, statutes, laws, and applicable regulations. To ensure the components <br /> of the attached Borrow Area Sediment Combined Quality Assurance and Quality Control Plan <br /> (Appendix H) are met and maintained, the CONTRACTOR shall prepare a Quality Assurance Plan <br /> specifying Quality Control (QC) procedures for all critical components of the work. The <br /> CONTRACTOR shall provide the COUNTY access to all QC procedures, data, and reports at any <br /> time at the request of the COUNTY. All activities associated with QA/QC shall be included in the <br /> costs for the Dredge and Fill bid item. <br /> Unless otherwise noted, the CONTRACTOR shall conduct all QC procedures. The QA Plan will be <br /> discussed at the Pre-Construction Meeting and the CONTRACTOR shall revise the QA Plan at the <br /> discretion of the COUNTY. COUNTY approval of the QA Plan shall be a required prerequisite to <br /> TECHNICAL AND ENVIRONMENTAL SPECIFICATIONS TS-38 <br />