37. 5 Surveys. Acceptance profile surveys shall be conducted by the CONTRACTOR. Surveys <br /> shall be conducted in accordance with Section 34 of these Technical Specifications. <br /> 37. 6 Volume Calculations. Profile azimuths are as shown in the Plans. Volume calculations <br /> between profiles shall be based on average end area method and shall be made by the <br /> ENGINEER. <br /> 38 . ACCEPTANCE SURVEYS <br /> The CONTRACTOR is not responsible for erosion of the beach fill following Acceptance by the <br /> COUNTY. The CONTRACTOR is responsible for maintaining the beach fill until it is Accepted by <br /> the COUNTY. Pre-construction and acceptance surveys conducted by the CONTRACTOR shall be <br /> in accordance with the standards set forth in Section 34 of these Technical Specifications. <br /> 39, PAYMENT FOR BEACH FILL PLACEMENT <br /> 39. 1 Payment. Other than costs for mobilization, demobilization, beach grass planting, bermed <br /> beach section, and beach tilling, all costs connected with debris removal, excavating, <br /> transportation of fill material, escarpment grading, and beach and dune construction shall <br /> be included in the contract unit price per cubic yard given under the Dredge and Fill bid <br /> item. The cost shall also include overhead, profit, labor, material, equipment and any other <br /> costs incidental to performing the work. <br /> 39.2 Progress Payment. Monthly progress payments shall be based solely on 100% completed <br /> and surveyed Acceptance Sections that have been Accepted by the COUNTY. Progress <br /> payments shall be subject to retainage as per Article 14.2 of the General Conditions of the <br /> Contract and per Article 4 of the Agreement. All field notes, computations and the records <br /> used by the CONTRACTOR to compute fill quantities shall be furnished to the COUNTY <br /> with the Application for Payment. Pay profile surveys will be conducted by the <br /> CONTRACTOR. Surveys will be conducted in accordance with Section 38 . The <br /> CONTRACTOR will be eligible for progress payments when four (4) consecutive <br /> Acceptance Sections have been completed. <br /> 39.3 Payment Calculations. Payment calculations shall be made using the average end-area <br /> method based on net quantities of beach fill placed and graded according to the <br /> requirements of Sections 30 and 31 and the design template requirements specified in the <br /> Plans. Calculations of fill quantity made by the CONTRACTOR shall be reviewed by the <br /> ENGINEER and/or the COUNTY. Gross fill quantities shall be based on the comparison <br /> of the pre-construction survey profiles to the acceptance profiles. Any fill above the <br /> 0.5-foot overfill tolerance shall be deducted from the gross fill quantities and payment shall <br /> be based on the net fill quantity. If the material does not readily assume the designed <br /> offshore slope, the contractor will be allowed to construct compensating slopes with the <br /> understanding that the pay volume of the designed template may not be exceeded. <br /> TECHSt <br /> TECHNICAL AND ENVIRONMENTAL SPECIFICATION _ _ = TS-37 <br />