My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-323A
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-323A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2016 1:36:04 PM
Creation date
10/1/2015 12:58:28 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Certificate
Approved Date
12/15/2009
Control Number
2009-323A
Agenda Item Number
8.D.
Entity Name
Florida Inland Navigation District
Subject
Dredged Material Exhibit B
Supplemental fields
SmeadsoftID
7963
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
surface (i . e . , deposition layer plus ponding) of less than 2 .6 in./hr. These rates are slow enough to allow close <br /> continual monitoring of the entire dike perimeter. However, ponding depth should not be permitted to <br /> increase beyond a maximum of 5 ft (5 . 8 ft at the weir) . Dike stability should be monitored continuously <br /> during periods when ponding depth is maintained above the 2-ft minimum . <br /> Optimal operating efficiency requires that flow through the containment basin approachs plug flow <br /> to the greatest degree possible. Uneven flow distribution — evidenced by irregular sediment deposition, <br /> channelization , and short-circuiting — increases flow velocities, reduces retention time, and promotes <br /> sediment resuspension . If inspection reveals an irregular deposition pattern, the inlet pipe should be <br /> repositioned to produce a more uniform depositional surface. <br /> Last, the incoming slurry should be periodically monitored at the containment basin inlet to confirm <br /> or refine dredge output specifications, including volumetric output and slurry solids content. These <br /> parameters, in combination with the actual duration of dredging, can be used as an independent measure of <br /> deposition volume to determine remaining site capacity. Additionally, the computed deposition volume can <br /> be used with pre- and post-dredging bathymetric surveys of the channel and , following placement and <br /> dewatering of the deposition layer, topographic surveys within the containment basin to refine the bulking <br /> factor employed to translate in situ dredging volume to required storage volume. Also, within the same <br /> monitoring program, the quality of dredged sediment should be established by laboratory analysis of grain <br /> size distributions, settling velocities, specific gravity, and Atterberg limits . <br /> 3.3 Weir Operation <br /> Weir operation — that is, controlling the ponding depth and flow rate over the weir by adjusting the <br /> weir crest elevation -- is the procedure most critical to maintaining effluent quality during dredging and <br /> decanting operations . Operational requirements extend to the period during and immediately after <br /> containment basin construction . Initially, the weir crest elevation should be set as high as necessary to <br /> prevent unwanted release of stormwater and groundwater seepage. Before the site ' s initial use, the site <br /> operator will periodically release ponded stormwater and groundwater seepage during regularly scheduled <br /> inspections. <br /> 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.