My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-323A
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-323A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2016 1:36:04 PM
Creation date
10/1/2015 12:58:28 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Certificate
Approved Date
12/15/2009
Control Number
2009-323A
Agenda Item Number
8.D.
Entity Name
Florida Inland Navigation District
Subject
Dredged Material Exhibit B
Supplemental fields
SmeadsoftID
7963
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
prediction and interpretation of basin performance and effluent quality in terms of these standards can be <br /> problematic . This situation arises from the incompatibility of established design and compliance criteria. <br /> State standards for effluent turbidity are expressed in terms of optical clarity relative to ambient conditions <br /> of the receiving waters . By comparison, containment area design guidelines published by the U .S . Army <br /> Corps of Engineers Waterways Experiment Station (WES) under the Dredged Material Research Program <br /> (DMRP) relate containment area performance to the suspended solids concentration of the effluent . The level <br /> of turbidity produced by a specific suspended solids concentration depends highly on the physical <br /> characteristics of the suspended material . Previous investigation (e .g. , Walski and Schroeder, 1978) could <br /> not establish a method to effectively translate suspended solids concentration to optical clarity even for <br /> sediments with well-defined physical characteristics. The design and operation of this and other similar sites <br /> would greatly benefit from such a predictive relationship . A primary objective of the effluent monitoring <br /> program should be to relate suspended solids concentration to the state performance criterion based on <br /> turbidity for sediments typically encountered in the ICW W . <br /> 3 . 5 Groundwater Monitoring <br /> As discussed in Section 2 .4, groundwater monitoring forms a key element of Site IR- 14 ' s long-term <br /> management. Sampling and analysis of groundwater throughout the dredging and decanting operation <br /> comprises an essential component of the monitoring program . The duration of this program component <br /> should extend from the start of dredging to the completion of decanting, a period projected to last about 8 to <br /> 12 weeks. <br /> The site ' s first use as a containment facility will likely be the most crucial period for monitoring the <br /> potential seepage of saline water through the dike ' s side slopes and foundation . During this time, soils <br /> forming the dike will be most porous due to their disturbance during site construction. Thus, the initial period <br /> of each dredging operation requires frequent sampling and analysis of groundwater. During the site's initial <br /> use, groundwater samples should be taken twice every 24 hours . This sampling regimen should begin at the <br /> start of dredging and continue for a period equivalent to the theoretical transit time of saline water from the <br /> basin to the furthermost sampling well . Maximum transit time should be estimated during the final site <br /> design process, given adequate datato define soil permeability, stratification, and the governing groundwater <br /> flow gradient . Such data should be obtained from core borings taken in association with monitoring well <br /> 34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.