My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-323A
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-323A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2016 1:36:04 PM
Creation date
10/1/2015 12:58:28 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Certificate
Approved Date
12/15/2009
Control Number
2009-323A
Agenda Item Number
8.D.
Entity Name
Florida Inland Navigation District
Subject
Dredged Material Exhibit B
Supplemental fields
SmeadsoftID
7963
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
installation . Following the estimated maximum transit time through the remainder of the decanting process, <br /> sampling should occur a minimum of once every 24 hours . If at any time elevated chloride levels are <br /> detected in the monitoring wells, pumping will be stopped and ponding depth will be reduced until additional <br /> corrective measures can be taken . These may include the installation of a system of well points around the <br /> dike to reverse groundwater flow. Operational experience has shown that dike permeability decreases as the <br /> dike material filters and traps the finer fraction of dredged sediments. Thus, saline seepage from the <br /> containment basin should become increasingly limited with each successive dredging operation . <br /> 3 .6 Migratory Bird Protection <br /> Should dredging be necessary during the migratory bird nesting season (April 1 through September <br /> 1 ), procedures presented in Appendix I of the Migratory Bird Policy (COE, 1993 ) will be implemented . <br /> These procedures include a variety of measures, summarized in Section 2. 5 , to ensure avoidance of impacts <br /> to migratory birds during periods of active dredging operations. <br /> 35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.