My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-323A
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-323A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2016 1:36:04 PM
Creation date
10/1/2015 12:58:28 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Certificate
Approved Date
12/15/2009
Control Number
2009-323A
Agenda Item Number
8.D.
Entity Name
Florida Inland Navigation District
Subject
Dredged Material Exhibit B
Supplemental fields
SmeadsoftID
7963
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
approved lubricant/sealant to the entire length of the spline and insert a spline into the slot . If necessary to <br /> firmly seat the spline against the bottom of the slot, the weir operator may drive it into position by placing <br /> a short length of 4x4 with a matching mortise over the spline and striking the 4x4 with a hammer until <br /> lubricant extrudes from the joint on both sides of the spline. To prevent deformation of the spline, the <br /> operator should not directly strike the spline under any circumstance. The operator then must align the <br /> slot of the board to be added with the spline just inserted, and apply pressure to the added board until its <br /> bottom face seats firmly against the upper face of the board below . Again, to preserve a smooth mating <br /> surface, the operator must not strike the weir board directly with the hammer, but rather must first place <br /> the short section of 4x4 on the board being added and then strike that section. <br /> With the added weir board seated firmly against the board below, the final step in adding each <br /> weir board requires that the weir operator secure the board in position as follows : <br /> 1 . If necessary to force the downstream face of the added board firmly against the flange <br /> extension, temporarily drive a wooden shim between the inner surface of the upstream I- <br /> beam channel flange and the plywood that temporarily diverts the flow. <br /> 2 . Working from the downstream (inner) side of the flange, drill a pilot hole through the <br /> flange into the added board . The holes through the extension should then be enlarged <br /> such that the lag screw that will attach the weir boards to the flange extension will not <br /> bind in the hole . <br /> 3 . Insert a minimum 34n . lag screw through the extension hole, and drive it fully into the <br /> pilot hole in the weir board until the screw head seats against the extension and draws the <br /> downstream face of the weir board tightly against the flange extension. <br /> 4. After ensuring the added board remains firmly in position, remove the temporary <br /> plywood that had been blocking the flow (and , if used, the additional shims) . <br /> 5 . Proceed to the next weir stack, continuing the process until all three weir stacks are set at <br /> the same, higher elevation. <br /> 2 . 3 . 2 . 2 Weir Board Removal <br /> Following the completion of dredging, the contractor must begin decanting the ponded water <br /> within the basin by gradually removing the weir boards . Section 3 .4 describes the decanting process. <br /> However, in removing the individual boards, the contractor must follow the procedures outlined below . <br /> - 10 . <br />
The URL can be used to link to this page
Your browser does not support the video tag.