My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-323A
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-323A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2016 1:36:04 PM
Creation date
10/1/2015 12:58:28 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Certificate
Approved Date
12/15/2009
Control Number
2009-323A
Agenda Item Number
8.D.
Entity Name
Florida Inland Navigation District
Subject
Dredged Material Exhibit B
Supplemental fields
SmeadsoftID
7963
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ensure that all three weir crests remain at equal elevations, and that flow over all three <br /> weirs (as measured by the depth of flow over the weir crests) remains essentially equal , <br /> within the limits of adjustment provided by the weir boards . <br /> 3. 3. 1 Operational Ponding Depths <br /> Before dredging begins, the contractor must set the initial elevation of the weir crest . This initial <br /> weir crest elevation corresponds to the minimum ponding depth at the weirs that must be reached before <br /> the contractor releases any water from the basin. The minimum ponding depth reflects considerations of <br /> the basin 's retention performance with respect to the settling characteristics of the dredged sediment. The <br /> retention analysis presented in the IR- 14 Management Plan (Taylor et al . , March 1999) recommended a <br /> minimum 4. 0-ft ponding depth based on a retention analysis that reflected available sediment data and the <br /> performance characteristics of an 18-in . dredge . The analysis determined that for the 10 . 18-acre interior <br /> plan area of the IR- 14 containment basin, a 2 .0-ft ponding depth provided a maximum retention time of <br /> 6 .2 hours. This time exceeds the 4 . 1 hours required for the finest fraction of sediment anticipated for <br /> placement in the IR- 14 basin to settle out of the 2 .0-ft withdrawal depth, based on the projected settling <br /> characteristics of the sediment to be dredged . However, consideration of actual field conditions suggests <br /> that additional retention time may be required to provide adequate settling and further reduce effluent <br /> turbidity levels . Given that retention time is directly related to' ponding depth, increasing ponding depth to <br /> 4 . 0 ft also increases the maximum retention time to 12.4 hours, or over three times the required settling <br /> time . Experience with other similar FIND dredged material containment facilities has shown that <br /> increasing the ponding depth to 4 .0 ft should not compromise dike stability. As a result, to ensure that the <br /> DU- 8 facility produces acceptable effluent under all foreseeable conditions, the recommended mean <br /> operational ponding depth is set at 4 .0 ft, with 5 .0 ft the recommended maximum ponding depth . Section <br /> 3 . 3 . 2 further discusses maximum ponding depth and related dike inspection requirements . <br /> Based on a recommended 4.0-ft mean operational ponding depth, the contractor should set the <br /> weir crest to an initial elevation of 4. 0 ft above the -0.4 ft NGVD mean elevation of the basin floor, or <br /> +3 . 6 ft NGVD . Given the slope of the basin floor, this initial weir crest elevation also corresponds to 4 . 8 <br /> ft above the - 1 . 2 ft NGVD elevation of the weir base or sill . Lacking a bottom slot and spline to tie it to <br /> the weir base plate, the bottom weir board should be set in a thick layer of roofing asphalt or other <br /> approved sealant to minimize the potential for water to leak below the bottom board . Because the water <br /> nearest the basin floor contains the highest concentration of suspended sediment, the contractor must take <br /> particular care to seal the bottom weir board to the weir base plate as well as to the flange extension. All <br /> - 15 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.