Laserfiche WebLink
Option A-Spot Measured Savings <br /> The verification techniques for Option A determine savings by measuring the capacity or efficiency of <br /> a <br /> system before and after a retrofit and by multiplying the difference by an agreed-upon or " stipulated " factor, <br /> such as hours of operation or load on the system . Option A is best applied to individual loads or <br /> systems <br /> within a building , such as a lighting system or chiller. <br /> Option A is an approach designed for projects in which the potential to generate savings must be verified , <br /> but the actual savings can be stipulated based on the results of the " potential to generate <br />savings" <br /> verification and engineering calculations (and perhaps on short-term data collection ) . Post- installation <br /> energy use is not measured throughout the term of the contract. Post-installation and perhaps baseline <br /> energy use is predicted using an engineering or statistical analysis of information that does not involve long- <br /> term measurements . Data from the estimates may come from historical data , information from other similar <br /> projects , and/or spot or short-term metering before and after ECM or system installation during the first year <br /> of operation . Spot savings is the easiest and least expensive method of determining savings . <br /> Option A includes procedures for verifying that: <br /> Baseline conditions have been properly defined . <br /> The equipment and/or systems that were contracted to be installed have been installed . <br /> The installed equipment/systems meet contract specifications in terms of quantity , quality , and rating . <br /> • The installed equipment is operating and performing in accordance with contract specifications and is <br /> meeting all functional tests . <br /> • The installed equipment/systems continue , during the term of the contract, to meet contract <br /> specifications in terms of quantity , quality , rating , operation , and functional performance . <br /> This level of verification is all that is contractually required for certain types of performance contracts . <br /> The <br /> potential to generate savings may be verified through observation , inspections , and/or spot/short-term <br /> metering conducted immediately before and/or immediately after installation . Annual (or some other regular <br /> interval ) inspections may also be conducted to verify an ECM ' s or system ' s continued potential to generate <br /> savings . Savings potential are quantified using computational methods . <br /> Indian River County , Florida 19 Indian River County Phase 2 <br /> Phase 11 Rev . 10/09 <br />