Laserfiche WebLink
Option B=Measured Specific Savings <br /> Verification techniques for Option B are designed for projects in which short term or long -term/continuous <br /> measurement of performance is desired . Under Option B , individual loads are either measured via short <br /> term or continuously monitored after ECM or system installation to determine performance . This measured <br /> performance is compared with a baseline model to determine savings . Option B relies on the <br /> direct <br /> measurement of end uses affected by the retrofit. <br /> Option B is for projects in with more complex ECMs (than Option A) , which can be isolated . The savings <br /> must be verified and the actual energy use during the contract term needs to be measured for comparison <br /> with the baseline model for calculating savings . Option B : <br /> • Confirms that the proper equipment/systems were installed and that they have the potential to generate <br /> predicted savings . <br /> • Determines an energy ( and cost) savings value using measured data taken throughout the contract <br /> term . <br /> Methods involve the use of post-installation measurement of one or more variables . The use of periodic or <br /> long-term measurement accounts for operating variations and will more closely approximate actual energy <br /> savings than the use of Option A . <br /> Indian River County , Florida 20 Indian River County Phase 2 <br /> Phase 11 Rev . 10/09 <br />