My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-200
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-200
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2016 1:25:01 PM
Creation date
9/30/2015 7:56:19 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
08/24/2004
Control Number
2004-200
Agenda Item Number
7.G.
Entity Name
George French
Subject
US 1 Water Main from Grove Isle Estates to Garden Grove
Area
Garden Grove
Archived Roll/Disk#
3223
Supplemental fields
SmeadsoftID
4245
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE 3 . CONTRACT TIME , <br /> 3 . 1 The work will be completed in accordance with the following time frame . <br /> (a ) Within 10 calendar days from effective date of Notice to Proceed , Contractor <br /> shall complete the following tasks : <br /> 1 . Obtain all necessary permits . <br /> 2 . Receive approved shop drawings for all materials and equipment to be <br /> utilized in the job . <br /> 3 . Perform all photographic recording and documentation of conditions prior <br /> to construction . <br /> 4 . Locate all existing utilities in the area of work . <br /> 5 . Mobilize all labor, equipment, and materials . <br /> 6 . Deliver and store all equipment and materials to the job site . <br /> 7 . Notify all utilities and other affected parties prior to initiating construction . <br /> ( b ) From IE calendar days to 00 calendar days from the effective date of Notice to <br /> Proceed , the CONTRACTOR shall complete the following tasks : <br /> 1 . Install all pipe and appurtenant items . <br /> 2 . Perform all testing . <br /> 3 . Restore all disturbed areas to their pre-construction condition . <br /> 4 . Correct all deficiencies noted by Engineer. <br /> Completion of all tasks outlined above ( i . e . , Subparagraphs a and b ) constitutes <br /> Substantial Completion . <br /> ( b ) From 01 calendar days to 12.0 calendar days from the effective date of Notice to <br /> Proceed , the CONTRACTOR shall complete the following tasks : <br /> 1 . Clean up project area . <br /> 2 . Remove all equipment and material from project site . <br /> 3 . Perform contract closeout procedures . <br /> Completion of all tasks outlined above (i . e . , Subparagraphs a , b , and c) constitute Final <br /> Completion . <br /> 3 . 2 Liquidated Damages . OWNER and CONTRACTOR recognize that time is of the <br /> essence of this Agreement and that OWNER will suffer financial loss if the work is not <br /> completed within the times specified in Paragraph 3 . 1 above , plus any extensions thereof <br /> allowed in accordance with Article 12 of the General Conditions . They also recognize the <br /> 00530-2 <br /> F :\Utilities\UTILITY - ENGINEERING\Projects - Utility Construction Permits\IRC - US 1 Water Main from Grove Isle Estates to <br /> Garden Grove UCP #2395\BID DOCUMENTS\BID DOCUMENTS\00530 EJCDC - REVISED (per Marion) Agreement between <br /> Owner and Contractor.doc <br />