Laserfiche WebLink
a draft mitigation plan, based upon the ecological values of wetland <br /> impacts . <br /> TASK III — Wetland Rapid Assessment Procedure / UMAM <br /> TASK III : GKE will conduct a Wetland Rapid Assessment Procedure (WRAP) <br /> and/or a Uniform Mitigation Assessment Method (UMAM) of the <br /> wetlands located within the boundaries of the project site . WRAP/UMAM <br /> determine a numerical value for the ecological functions and ecological <br /> values of the existing wetlands and mitigation site . The WRAP/UMAM <br /> score can be used to determine what type / amount of mitigation will be <br /> required for the project site . The WRAP/UMAM score is based on <br /> vegetation, wildlife usage, hydrology, soils, water quality, success factor, <br /> and adjacent lands . <br /> TASK IV — Protected Species <br /> TASK IV : GKE will complete a detailed protected species survey on the referenced <br /> site . GKE ecologist will conduct a preliminary systematic survey for <br /> protected species in accordance with Florida Fish and Wildlife <br /> Conservation Commission (FFWCC) Guidelines . GKE ecologist will <br /> record all observations of listed protected species and features that may <br /> indicate species presence . Physical features may include, but are not <br /> limited to , tree markings, burrows, tracks, nests, scat, and cavity trees . <br /> GKE will request that the U. S . Fish and Wildlife Service (FWS) and the <br /> Florida Fish & Wildlife Commission (FFWCC) review their files for the <br /> presence of any listed species that may be present onsite . <br /> TASK V — Vegetation Survey (FLUCCS) <br /> TASK V : GKE will conduct a systematic survey of vegetation using the Florida <br /> Land Use, Cover and Classification System (FLUCCS), A Technical <br /> Report. FLUCCS was developed by the State of Florida, Department of <br /> Administration, Division of State Planning, Bureau of Comprehensive <br /> Planning, April 1976 . GKE ecologist will base the vegetative community <br /> descriptions upon field survey observations, SCS soil maps, and aerial <br /> photograph interpretation. <br /> TASK VI — Historical / Archaeological Resources <br /> TASK VI : GKE will coordinate historical and/or archaeological resources with the <br /> Florida Department of State, Division of Historical Resources, State <br /> - Page 2 of 4 <br /> GKE / Davis / IRC <br /> Proposal / Oslo Boat Ramp <br /> 7-26-04 <br />