My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-187
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-187
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2016 1:43:48 PM
Creation date
9/30/2015 8:48:51 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Migration
Approved Date
05/24/2005
Control Number
2005-187
Agenda Item Number
14.B.3
Entity Name
GeoSyntec Consultants
Subject
Proposal Groundwater monitoring; Work Order No.1
Work Authorization No.01
Area
South Gifford Road Landfill
Supplemental fields
SmeadsoftID
4966
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
South Gifford Road Landfill <br /> Indian River County <br /> SEMI -ANNUAL <br /> 16 . The required monitoring results must be submitted to the Departmen within sixty <br /> (60 ) days of receipt from the laboratory . There are two options ior reporting <br /> monitoring results . [ 62-522. 600(11) (b) & 62-4. 070(3), F.A . C. ] <br /> 1 . Paper Reporting : The Parameter Report Forms semi -annual monitoring <br /> are attached . In order to facilitate entry of this data into the Sta a computer <br /> system (WACS ) , these forms or exact replicas must be used and ust not be <br /> altered as to content . The original copies of the forms should be ret ined so that <br /> the necessary information is available to properly complete future reports . The <br /> submittal shall also include Ground Water Monitoring Report (attached ) , <br /> laboratory reports with quality assurance information , Chain of Cus ody sheets , <br /> water sampling log (attached ) , ground water contour maps , a summary of any <br /> water quality standards or minimum criteria that are exceeded , and <br /> recommended corrective action . Interpretative documents such as exceedance <br /> summary and /or contour maps must be certified by a professional licensed in <br /> state of Florida whose expertise is related to the document . <br /> 2 . Electronic Reporting : The Department has developed compu er software , <br /> called Validator to evaluate monitoring data and transfer the d to into the <br /> Department computer database . Electronic data management saves time and <br /> reduces costs . It also eliminates errors generated by manual data input . The <br /> data and other related information are prepared in Microsoft Excel and saved as <br /> a tab -delimited text file . <br /> In order to maintain integrity of electronic data , the Department asks that two (2 ) <br /> copies of electronic data files be submitted on compact disc media r adable by a <br /> Microsoft Windows computer . One should be in a tab-delimited text file and one <br /> should be in portable document format ( PDF) . Details on how to c mplete the <br /> text file for electronic processing is presented in Table 1 . <br /> We encourage you to use Validator to evaluate the electronic data , and make <br /> any necessary revisions or corrections before submittal to the Department . <br /> Preparation of a text file as outlined in Table I enables the Validator to function . <br /> A sample text file may be viewed at : <br /> http : //www . dep . state . fl . us/labs/software/sampledata . txt <br /> Table 1 . Electronic Laboratory Data Submittal Fields for Validator/WACS Upload <br /> Field Name Description <br /> WACS—Facility WACS ID used to identify site where data will be uploaded . Information may <br /> be obtained from Monitoring Plan issued by the Department to the facilities . <br /> Project Proper name for facility used to confirm WACS ID . Information may be <br /> obtained from Monitoring Plan issued by the Department to the facilities . <br /> WACS_Well WACS ID used to identify specific testsite (Well , Leachate , Surface Water, <br /> etc) . Information may be obtained from Monitoring Plan issued by the <br /> Department to the facilities . <br /> . 4 - <br /> 01 /06/05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.