My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-110
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2016 10:39:32 AM
Creation date
10/1/2015 3:30:09 AM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Himanshu Mehta P . E . <br /> 23 March 2009 <br /> Page 3 <br /> Phase I : General Consulting/Meeting Support/Project Management <br /> Phase I consists of three components : general consulting , meeting support , and project <br /> management . Geosyntec will provide SWDD with consulting services necessary to initiate the <br /> project and attend meetings , as necessary , with the SWDD and if necessary with SJRWMD and <br /> IRFWCD . Geosyntec will prepare presentation graphics , engineering drawings , and other <br /> documents required to support the meetings and project coordination activities . <br /> Project management activities will include : budget and schedule tracking , invoice review , and <br /> project communications , including the preparation of a monthly progress report . The project <br /> report will include a description of the activities completed during the month and planned <br /> activities for the following month . In addition , the progress report will identify any technical or <br /> administrative issues that require SWDD ' s attention and the current status of the budget and <br /> schedule . <br /> For the purpose of this budget estimate , Geosyntec has included two (2 ) quarterly meetings with <br /> the SWDD over the two years of the project , to review the project progress , discuss problems <br /> encountered during the quarter and evaluate alternative solutions . Any of these meetings may <br /> also include discussions with SJRWMD and IRFWCD to address compliance issues . Following <br /> each meeting , Geosyntec will prepare meeting minutes that document decisions reached in the <br /> meetings . <br /> Phase 2 : Site Preparation <br /> Geosyntec will undertake the following tasks : <br /> Task 2 . 1 : Kickoff Meeting and Site Reconnaissance <br /> Geosyntec will meet with representatives of the SWDD and its construction contractor to review <br /> the construction and dewatering schedule for the borrow area and establish milestones dates <br /> required by the permit conditions . We will visit the site with our licensed surveyor and <br /> groundwater monitoring well installer to inspect the locations designated for installation of the <br /> eight ( 8 ) piezometers and three ( 3 ) staff gages identified in the permit conditions . We <br /> will <br /> prepare and submit to SJRWMD the monitoring well design , and a site plan showing the <br /> locations of the 8 piezometers , the 3 staff gages , and the rain gage for approval prior to the wells <br /> installations in compliance with Condition 20 of the permit. The site plan will maximize the use <br /> of existing piezometers in order to minimize the need to install new groundwater monitoring <br /> wells . We will also respond to comments and questions from the SJRWMD that may arise from <br /> the Agency review <br /> NC P2009/X L09084/J L90075 .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.