2008-030
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2026 11:47:37 AM
Creation date
9/30/2015 11:56:23 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
01/22/2008
Control Number
2008-030
Agenda Item Number
14.B.1
Entity Name
Geosyntec Consultants
Subject
2008 Compliance Monitoring & General Technical Assistance
Work Order No.14
Supplemental fields
SmeadsoftID
6851
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 1 <br />BUDGET ESTIMATE <br />COMPLIANCE MONITORING REPORTING AND OTHER <br />TECHNICAL SUPPORT SERVICES <br />CLASS I LANDFILL AND C&D DEBRIS DISPOSAL FACILITY <br />INDIAN RIVER COUNTY, FLORIDA <br />TASK 01: PROJECT MANAGEMENT/MEETINGS <br />In compliance with Section 112.061 F.S. <br />XL07246JL70724_revised.zls Geosyntec Consultants <br />ITEM <br />BASIS <br />RATE <br />QUANTITY <br />ESTIMATED COST <br />Professional Services <br />a. Principal <br />Hr <br />$189 <br />0 <br />$0 <br />b. Associate <br />Hr <br />$179 <br />60 <br />$10,740 <br />c. Senior Project Engineer <br />Hr <br />$158 <br />0 <br />$0 <br />d. Project <br />Engineer <br />Hr <br />$125 <br />20 <br />$2,494 <br />e. Engineer <br />Hr <br />$109 <br />0 <br />$0 <br />f. Senior Staff Engineer <br />Hr <br />1 $97 <br />0 <br />$0 <br />g. Staff Engineer <br />Hr <br />1 $81 <br />16 <br />$1,302 <br />Subtotal Professional Services <br />$14,536 <br />a. CADD Designer <br />Hr <br />$115 <br />0 <br />$0 <br />b. Drafter/CADD Operator/Artist <br />Hr <br />$70 <br />0 <br />$0 <br />c. Technical/Administrative Assistant <br />Hr <br />$79 <br />8 <br />$629 <br />d. Technical Word Processor <br />Hr <br />$80 <br />8 <br />$642 <br />e. Clerical <br />Hr <br />$48 <br />40 <br />$1,930 <br />Subtotal Technical/Administrative Services <br />$3,201 <br />C, Reimbursable's <br />a. Lodging <br />Day <br />$100 <br />0 <br />$0 <br />b. Per Diem' <br />Day <br />$21 <br />0 <br />$0 <br />c. Communications Fee <br />3% Labor <br />0.03 <br />$17,738 <br />$532 <br />d. CADD Computer System <br />Hr <br />$15 <br />0 <br />$0 <br />e. Vehicle Rental` <br />Day <br />$100 <br />2 <br />$200 <br />f. 8"x11" Photocopies <br />Each <br />$0.12 <br />100 <br />$12 <br />g. CADD Drawings <br />Each <br />$3 <br />0 <br />$0 <br />Subtotal Reimbursables <br />$744 <br />TOTAL ESTIMATED BUDGET: <br />TASK 01 <br />` $18,482 <br />In compliance with Section 112.061 F.S. <br />XL07246JL70724_revised.zls Geosyntec Consultants <br />