My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-030
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2026 11:47:37 AM
Creation date
9/30/2015 11:56:23 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
01/22/2008
Control Number
2008-030
Agenda Item Number
14.B.1
Entity Name
Geosyntec Consultants
Subject
2008 Compliance Monitoring & General Technical Assistance
Work Order No.14
Supplemental fields
SmeadsoftID
6851
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 2 <br />BUDGET ESTIMATE <br />COMPLIANCE MONITORING REPORTING AND OTHER <br />TECHNICAL SUPPORT SERVICES <br />CLASS I LANDFILL AND C&D DEBRIS DISPOSAL FACILITY <br />INDIAN RIVER COUNTY, FLORIDA <br />TASK 02: PREPARATION OF ANNUAL AND SEMI-ANNUAL REPORTS <br />In compliance with Section 112.061 F.S. <br />XL07246/JL70724_revised. As Geosyntec Consultants <br />ITEM <br />BASIS <br />RATE <br />QUANTITY <br />ESTIMATED COST <br />Ffgfessjdia# <br />services <br />x <br />a. Principal <br />Hr <br />$189 <br />8 <br />$1,512 <br />b. Associate <br />Hr <br />$179 <br />40 <br />$7,160 <br />G. Senior Project <br />Engineer <br />Hr <br />$158 <br />0 <br />$0 <br />d. Project <br />Engineer <br />Hr <br />$125 <br />40 <br />$4,989 <br />e. Engineer <br />Hr <br />$109 <br />0 <br />$0 <br />f. Senior Staff Engineer <br />Hr <br />1 $97 <br />1 60 <br />$5,804 <br />g. Staff Engineer <br />Hr <br />$81 <br />80 <br />$6,510 <br />,y Subtotal Professional Services <br />a. CADD Designer Hr $115 0 <br />$25 975 <br />$0 <br />b. Drafter/CADD Operator/Artist <br />Hr <br />$70 <br />40 <br />$2,812 <br />c. Technical/Administrative Assistant <br />Hr <br />$79 <br />0 <br />$0 <br />d. Technical Word Processor <br />Hr <br />$80 <br />16 <br />$1,284 <br />e. Clerical <br />Hr <br />$48 <br />16 <br />$772 <br />Subtotal Technical/Administrative Services <br />C`Ffeijbutsap)gs:' <br />$45869 <br />�_ ,. <br />a. Vehicle Rental* <br />Day <br />$100 <br />10 <br />$1,000 <br />b. Communications Fee <br />3% Labor <br />$0.03 <br />$30,843 <br />$925 <br />c. Lodging <br />Day <br />$100 <br />8 <br />$800 <br />d. Per Diem <br />Day <br />$21 <br />8 <br />$168 <br />e. CADD Computer System <br />Hr <br />$ 15.00 <br />$40 <br />$600 <br />f. 8"01" Photocopies <br />Each 1 <br />$0.12 1 <br />500 <br />$60 <br />g. CADD Drawings <br />Each <br />$3.00 <br />20 <br />$60 <br />Subtotal Reimbursables <br />- _ TOTAL ESTIMATED. BUDGET :TASK 023 <br />$3,613 <br />` $3494571 <br />In compliance with Section 112.061 F.S. <br />XL07246/JL70724_revised. As Geosyntec Consultants <br />
The URL can be used to link to this page
Your browser does not support the video tag.