My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-030
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2026 11:47:37 AM
Creation date
9/30/2015 11:56:23 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
01/22/2008
Control Number
2008-030
Agenda Item Number
14.B.1
Entity Name
Geosyntec Consultants
Subject
2008 Compliance Monitoring & General Technical Assistance
Work Order No.14
Supplemental fields
SmeadsoftID
6851
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu H. Mehta, P.E. <br />21 December 2007 <br />Page 3 <br />PROPOSED SCOPE OF WORK <br />The proposed scope of work includes activities to be performed on behalf of SWDD for the <br />compliance monitoring reporting and other technical support services for the Class I landfill and <br />C&D disposal facility. For the purpose of budgeting, the scope of work has been divided into <br />the following four main tasks: <br />• Task 1 — Project Management/Meetings; <br />• Task 2 — Annual and Semi -Annual Sampling and Reporting; <br />• Task') —Title V Permit Compliance and Reporting; and <br />• Task 4 —Miscellaneous Compliance and Technical Support. <br />The <br />remainder of this section presents a <br />general <br />description of the activities to be <br />performed in <br />each <br />task. <br />Task 1 — Proiect Management/Meetings <br />Under this task, Geosyntec will perform project planning and management responsibilities, such <br />as correspondence with SWDD and FDEP, invoice review, project coordination, and project <br />administration. Geosyntec has also included budget for preparation and attendance (by two <br />Geosyntec personnel) at two meetings with SWDD and/or FDEP, as needed. <br />Task 2 — Annual and Semi -Annual Sampling and Reporting <br />Geosyntec will: (i) assist the SWDD to perform the annual and semi-annual sampling; and (ii) <br />prepare the water -quality reports as required by the MPIS. Geosyntec will assist the SWDD to <br />conduct all field preparation activities, including scheduling, staffing, subcontracting, and field <br />equipment preparation. Geosyntec will assist the SWDD to perform the field testing, sample <br />collection, and water -level measurements. The laboratory analytical testing will be conducted by <br />CAS testing laboratory. Geosyntec will assist the SWDD to coordinate the analytical testing <br />activities with CAS, notify FDEP prior to sampling as required by the MPIS, review and <br />evaluate the analytical test results, and prepare the semi-annual reports. <br />The results of water -quality sampling under the MPIS will be presented in a report supported by <br />attachments containing chain -of -custody sheets, field notes and observations, water sampling <br />logs, maps, analytical results, and any other applicable materials. The reports will include <br />XL07246/71,70274.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.