My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-030
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2016 1:52:04 PM
Creation date
9/30/2015 11:56:23 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
01/22/2008
Control Number
2008-030
Agenda Item Number
14.B.1
Entity Name
Geosyntec Consultants
Subject
2008 Compliance Monitoring & General Technical Assistance
Work Order No.14
Supplemental fields
SmeadsoftID
6851
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu H . Mehta, P. E. <br /> 21 December 2007 <br /> Page 3 <br /> PROPOSED SCOPE OF WORK <br /> The proposed scope of work includes activities to be performed on behalf of SWDD for the <br /> compliance monitoring reporting and other technical support services for the Class I landfill and <br /> C&D disposal facility. For the purpose of budgeting, the scope of work has been divided into <br /> the following four main tasks : <br /> • Task 1 — Project Management/Meetings ; <br /> • Task 2 — Annual and Semi-Annual Sampling and Reporting; <br /> • Task ') — Title V Permit Compliance and Reporting; and <br /> • Task 4 — Miscellaneous Compliance and Technical Support . <br /> The remainder of this section presents a general description of the activities to be performed in <br /> each task. <br /> Task 1 — Proiect Management/Meetings <br /> Under this task, Geosyntec will perform project planning and management responsibilities, such <br /> as correspondence with SWDD and FDEP, invoice review, project coordination, and project <br /> administration. Geosyntec has also included budget for preparation and attendance (by two <br /> Geosyntec personnel) at two meetings with SWDD and/or FDEP, as needed . <br /> Task 2 — Annual and Semi-Annual Sampling and Reporting <br /> Geosyntec will : (i) assist the SWDD to perform the annual and semi-annual sampling; and (ii) <br /> prepare the water-quality reports as required by the MPIS . Geosyntec will assist the SWDD to <br /> conduct all field preparation activities, including scheduling, staffing, subcontracting, and field <br /> equipment preparation . Geosyntec will assist the SWDD to perform the field testing, sample <br /> collection, and water-level measurements . The laboratory analytical testing will be conducted by <br /> CAS testing laboratory . Geosyntec will assist the SWDD to coordinate the analytical testing <br /> activities with CAS , notify FDEP prior to sampling as required by the MPIS , review and <br /> evaluate the analytical test results, and prepare the semi-annual reports. <br /> The results of water-quality sampling under the MPIS will be presented in a report supported by <br /> attachments containing chain-of-custody sheets, field notes and observations , water sampling <br /> logs, maps, analytical results, and any other applicable materials . The reports will include <br /> XL07246/71,70274.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.