Laserfiche WebLink
Mr. Himanshu H. Mehta, P.E. <br />21 December 2007 <br />Page 4 <br />ground water completion report form and ground water elevation contour map, both signed and <br />sealed by a Florida registered professional engineer. These reports will be submitted to SWDD <br />for review prior to submittal to FDEP. According to the MPIS, monitoring test results must be <br />submitted to FDEP within 60 days of receipt of the analytical data from the laboratory. <br />Task 3 — Title V Permit Compliance and Reportin <br />Geosyntec will prepare and submit to FDEP the AOR for the calendar year 2007. We will <br />perform calculations to estimate the annual emission rates of non -methane organic compounds <br />(NMOCs) and volatile organic compounds (VOCs) from the landfill gas to determine if the <br />facility designation has changed from voluntary to mandatory with regard to operation and <br />reporting requirements of the active landfill gas collection and control system (GCCS) under the <br />New Source Performance Standards (NSPS) requirements. In the event of a status change, <br />Geosyntec will advise SWDD of its implications. We will also assist SWDD to prepare and <br />submit the Annual Statement of Compliance to FDEP and USEPA. <br />Geosyntec will also provide oversight of the annual visible emission testing of the flare <br />(expected for April 2008). We will advise FDEP of the time and location of the test; provide an <br />oversight during the test; and prepare and submit to FDEP a report of the test results. <br />Task 4 — Miscellaneous Compliance and Technical Support <br />Under this task, Geosyntec will provide SWDD with technical support and other miscellaneous <br />compliance services related to the operations of the Class I landfill and C&D disposal facility. <br />The miscellaneous compliance and reporting services will include: (i) compliance monitoring <br />requirements of the Multi -Sector Generic Permit for stormwater discharge; (ii) quarterly <br />monitoring/reporting of the landfill gas monitoring wells located at the IRCL site boundary, as <br />well as enclosed structures located on site; (iii) submittal of records of groundwater dewatering <br />volumes to St. Johns River Water Management District (SJWMD) in compliance with the <br />consumptive use water permit; (vi) engineering support for preparation of agenda items to <br />District Board and the development of annual budgets; and (v) other required renewal permits or <br />technical support that may become necessary. Table 1 presents a compliance monitoring and <br />reporting requirements and schedule for the IRCL site. <br />BUDGET ESTIMATE <br />A budget estimate <br />for the scope <br />of work outlined in Tasks I through 4 of <br />this proposal <br />is <br />summarized in the <br />following table, <br />and a detailed budget estimate is provided as Attachment <br />2. <br />XL07246000274 doe <br />