Laserfiche WebLink
Mr. Himanshu H . Mehta, P . E . <br /> 21 December 2007 <br /> Page 4 <br /> ground water completion report form and ground water elevation contour map , both signed and <br /> sealed by a Florida registered professional engineer. These reports will be submitted to SWDD <br /> for review prior to submittal to FDEP . According to the MPIS , monitoring test results must be <br /> submitted to FDEP within 60 days of receipt of the analytical data from the laboratory. <br /> Task 3 — Title V Permit Compliance and Reportine <br /> Geosyntec will prepare and submit to FDEP the AOR for the calendar year 2007 . We will <br /> perform calculations to estimate the annual emission rates of non-methane organic compounds <br /> (NMOCs) and volatile organic compounds (VOCs) from the landfill gas to determine if the <br /> facility designation has changed from voluntary to mandatory with regard to operation and <br /> reporting requirements of the active landfill gas collection and control system (GCCS) under the <br /> New Source Performance Standards (NSPS) requirements. In the event of a status change, <br /> Geosyntec will advise SWDD of its implications . We will also assist SWDD to prepare and <br /> submit the Annual Statement of Compliance to FDEP and USEPA. <br /> Geosyntec will also provide oversight of the annual visible emission testing of the flare <br /> (expected for April 2008). We will advise FDEP of the time and location of the test; provide an <br /> oversight during the test; and prepare and submit to FDEP a report of the test results. <br /> Task 4 — Miscellaneous Compliance and Technical Support <br /> Under this task, Geosyntec will provide SWDD with technical support and other miscellaneous <br /> compliance services related to the operations of the Class I landfill and C&D disposal facility . <br /> The miscellaneous compliance and reporting services will include : (i) compliance monitoring <br /> requirements of the Multi -Sector Generic Permit for stormwater discharge ; (ii) quarterly <br /> monitoring/reporting of the landfill gas monitoring wells located at the IRCL site boundary, as <br /> well as enclosed structures located on site; (iii) submittal of records of groundwater dewatering <br /> volumes to St. Johns River Water Management District (SJWMD) in compliance with the <br /> consumptive use water permit; (vi) engineering support for preparation of agenda items to <br /> District Board and the development of annual budgets; and (v) other required renewal permits or <br /> technical support that may become necessary. Table 1 presents a compliance monitoring and <br /> reporting requirements and schedule for the IRCL site. <br /> BUDGET ESTIMATE <br /> A budget estimate for the scope of work outlined in Tasks I through 4 of this proposal is <br /> summarized in the following table, and a detailed budget estimate is provided as Attachment 2 . <br /> XL07246000274 doe <br />