My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-030
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2026 11:47:37 AM
Creation date
9/30/2015 11:56:23 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
01/22/2008
Control Number
2008-030
Agenda Item Number
14.B.1
Entity Name
Geosyntec Consultants
Subject
2008 Compliance Monitoring & General Technical Assistance
Work Order No.14
Supplemental fields
SmeadsoftID
6851
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu H. Mehta, P.E. <br />21 December 2007 <br />Page 4 <br />ground water completion report form and ground water elevation contour map, both signed and <br />sealed by a Florida registered professional engineer. These reports will be submitted to SWDD <br />for review prior to submittal to FDEP. According to the MPIS, monitoring test results must be <br />submitted to FDEP within 60 days of receipt of the analytical data from the laboratory. <br />Task 3 — Title V Permit Compliance and Reportin <br />Geosyntec will prepare and submit to FDEP the AOR for the calendar year 2007. We will <br />perform calculations to estimate the annual emission rates of non -methane organic compounds <br />(NMOCs) and volatile organic compounds (VOCs) from the landfill gas to determine if the <br />facility designation has changed from voluntary to mandatory with regard to operation and <br />reporting requirements of the active landfill gas collection and control system (GCCS) under the <br />New Source Performance Standards (NSPS) requirements. In the event of a status change, <br />Geosyntec will advise SWDD of its implications. We will also assist SWDD to prepare and <br />submit the Annual Statement of Compliance to FDEP and USEPA. <br />Geosyntec will also provide oversight of the annual visible emission testing of the flare <br />(expected for April 2008). We will advise FDEP of the time and location of the test; provide an <br />oversight during the test; and prepare and submit to FDEP a report of the test results. <br />Task 4 — Miscellaneous Compliance and Technical Support <br />Under this task, Geosyntec will provide SWDD with technical support and other miscellaneous <br />compliance services related to the operations of the Class I landfill and C&D disposal facility. <br />The miscellaneous compliance and reporting services will include: (i) compliance monitoring <br />requirements of the Multi -Sector Generic Permit for stormwater discharge; (ii) quarterly <br />monitoring/reporting of the landfill gas monitoring wells located at the IRCL site boundary, as <br />well as enclosed structures located on site; (iii) submittal of records of groundwater dewatering <br />volumes to St. Johns River Water Management District (SJWMD) in compliance with the <br />consumptive use water permit; (vi) engineering support for preparation of agenda items to <br />District Board and the development of annual budgets; and (v) other required renewal permits or <br />technical support that may become necessary. Table 1 presents a compliance monitoring and <br />reporting requirements and schedule for the IRCL site. <br />BUDGET ESTIMATE <br />A budget estimate <br />for the scope <br />of work outlined in Tasks I through 4 of <br />this proposal <br />is <br />summarized in the <br />following table, <br />and a detailed budget estimate is provided as Attachment <br />2. <br />XL07246000274 doe <br />
The URL can be used to link to this page
Your browser does not support the video tag.