Mr. Himanshu Mehta <br />11 July 2008 <br />Page 9 <br />documents. Resident engineering support services are expected to include engineers, <br />administrative assistants, CADD operators, and word processors, as needed. Resident engineer <br />support services are budgeted only for the construction period extending beyond that of the <br />vertical expansion. <br />As part of the Resident Engineering task, Geosyntec will prepare a final CQA closure <br />certification report. The closure certification reports will include as -built record drawings for the <br />Project. The report will contain a narrative describing, in detail, the aspects of field activities <br />associated with the closure system construction, specifically with reference to the activities <br />identified in this proposal. The report will also include a summary of all conformance and <br />performance tests conducted, testing frequencies, and test results showing compliance with the <br />Technical Specifications and the CQA plan. The documentation of construction activities <br />(presented on daily summary reports, monitoring logs, test data sheets, nonconformance <br />identification and corrective measures reports, and design change records) will be included as <br />appendices to the final report. The as -built record drawings will be prepared for the Project, in <br />CADD format, in order to illustrate the details of construction, any approved design changes, and <br />other relevant information. <br />The final CQA certification report and as -built record drawings will be signed and sealed by a <br />registered professional engineer in the State of Florida. Geosyntec will prepare the report within <br />30 days of completing the construction activities. Five copies of the final CQA certification <br />report will be submitted to FDEP for approval on behalf of SWDD. An electronic copy of as - <br />built drawings in AutoCAD 2000 format will also be submitted to SWDD. <br />BUDGET ESTIMATE <br />A budget estimate for the scope of work outlined in Phase 1 and Phases 5 through 7 of this <br />proposal is summarized in the following table, and a detailed budget estimate is provided as <br />Attachment 2. The budget estimate does not include permit fees that will be required at the time <br />the permit application is submitted to FDEP. <br />Phase 5 — Class I Closure Design and Permitting $189236 <br />Phase 6 — Construction Procurement Services $139744 <br />Phase 7 — Construction Support Services $90,725 <br />TOTAL $1225705 <br />Geosyntec will not exceed the cost estimate without prior approval and written authorization <br />from SWDD. <br />XR08168/JL80186.doc <br />I scientists I innovators <br />