Laserfiche WebLink
Mr. Himanshu Mehta <br /> 11 July 2008 <br /> Page 8 <br /> Geosyntec will provide on- site monitoring services for the activities associated with construction <br /> of the project . The CQA services will be provided by a CQA Site Manager and Engineering <br /> Technicians , as needed . The CQA Site Manager will be responsible for CQA activities <br /> throughout the Project including monitoring construction, coordinating soils testing (if needed) , <br /> and maintaining documentation of CQA activities at the site . <br /> Geosyntec will assign one CQA field personnel for every major construction activity being <br /> performed by the Contractor. Any non-conforming or questionable practices observed by <br /> Geosyntec will be brought to the attention of the concerned parties for review and correction . <br /> Geotechnical Laboratory Services <br /> Geosyntec will provide independent geotechnical QA/QC laboratory testing related to the <br /> construction . Experienced laboratory technicians will perform the required soils conformance <br /> tests in accordance with the test methods described in the Technical Specifications . The test <br /> results will be reviewed by the CQA Site Manager. SWDD will be provided with regular <br /> updates of the conformance testing activities and results . Summary reports of the laboratory <br /> conformance test results will be presented in the certification report . <br /> Task 7. 2 : Construction Mana ement <br /> Under this subtask, Geosyntec will provide construction management services throughout the <br /> duration of construction. Construction management activities will include conducting a pre- <br /> construction meeting with the contractor (WM) , preparing a detailed construction schedule using <br /> critical path method (CPM) of scheduling for evaluating construction progress , assisting the <br /> contractor in identifying critical construction tasks and material procurement activities , providing <br /> assistance to the contractor in formulating plans to regain the project schedule in case of <br /> unforeseen delays , and verifying quantities and conformance with the plans and specifications . <br /> Task 7. 3 : Resident Engineering <br /> Under this subtask, Geosyntec will provide resident engineering support services throughout the <br /> duration of construction . Resident engineering support services will include Construction <br /> Drawings and Technical Specifications interpretation or clarification , an evaluation of any <br /> changed conditions , and engineering analyses for any design changes or improvisations . <br /> Geosyntec will also provide support to SWDD in the preparation of modifications , deletions , or <br /> additions to the contract documents . Contractor change proposals will be evaluated for technical <br /> merit, conformance with design intent , and reasonableness with respect to pricing. Geosyntec <br /> will also assist SWDD in the review and approval process for submittals required by the contract <br /> XR08168/JL80186 . doc <br /> en ;ineers I scientists I innovators <br />