My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-249
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-249
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2016 10:53:28 AM
Creation date
10/1/2015 12:28:28 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
First Amendment
Approved Date
08/12/2008
Control Number
2008-249
Agenda Item Number
15.B.5
Entity Name
Geosyntec Consultants,Inc.
Subject
Amendment No.1 to Work Order No.16 Services at Landfill
Area
Southern Indian River County Landfill
Supplemental fields
SmeadsoftID
7517
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr . Himanshu Mehta <br /> 11 July 2008 <br /> Page 7 <br /> Geosyntec will prepare and submit a set of construction drawings for the closure system specified <br /> in the Closure Permit Application as part of the vertical expansion construction drawings . The <br /> construction drawings will be extracted from the permit drawings and will include sufficient <br /> details for construction of the closure system, storm water features , and other related construction <br /> activities associated with the closure of the Class I disposal area within Segment 2 and Infill . <br /> The construction drawings will include control points along the toes of slopes , and other critical <br /> locations , including 50- ft grid intervals , to facilitate construction and certification of the Project . <br /> Technical Specifications and the CQA Plan will be compiled as part of the Construction <br /> Documents . The specifications will be prepared using the industry- standard Construction <br /> Specification Institute (CSI) format. <br /> Task 6. 2 : Construction Cost Estimate <br /> Geosyntec will also prepare an Engineer ' s Estimate of Probable Construction Cost and a <br /> construction schedule to serve as a basis for comparison of bids during the procurement process . <br /> Probable construction cost will be based on estimated construction quantities for the project and <br /> engineering estimate of the probable unit cost for each item . Probable construction costs will be <br /> based on such catalogues as R . S . Means , information provided by product manufacturers , and <br /> Geosyntec ' s professional judgment and experience with similar closure system and installation <br /> projects . Additionally, Geosyntec will prepare a construction schedule based on Geosyntec ' s <br /> understanding of the Project and experience with similar closure system installation projects . <br /> Phase 7 : Construction Support Services <br /> Geosyntec proposes to perform the construction-related services and provide engineering support <br /> associated with construction of the Project under three tasks . These include : (i) Field CQA <br /> Services ; (ii ) Construction Management ; and (iii ) Resident Engineering. <br /> Task 7. 1 : Field CQA Services <br /> Under this task , Geosyntec will provide CQA services during construction of the Project . <br /> Quality assurance monitoring, testing methods , test frequencies , and the reporting requirements <br /> will be performed in accordance with the CQA Plan , ASTM Standards , and applicable portions <br /> of Chapter 62 - 701 , FAC . The work will be executed by an experienced project team consisting <br /> of office managerial staff and on- site CQA representatives . <br /> XR09I68/JL80I86 . doe <br /> t:^ n � ineurs I scientists I innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.