Laserfiche WebLink
Mr . Himanshu Mehta <br /> 11 July 2008 <br /> Page 7 <br /> Geosyntec will prepare and submit a set of construction drawings for the closure system specified <br /> in the Closure Permit Application as part of the vertical expansion construction drawings . The <br /> construction drawings will be extracted from the permit drawings and will include sufficient <br /> details for construction of the closure system, storm water features , and other related construction <br /> activities associated with the closure of the Class I disposal area within Segment 2 and Infill . <br /> The construction drawings will include control points along the toes of slopes , and other critical <br /> locations , including 50- ft grid intervals , to facilitate construction and certification of the Project . <br /> Technical Specifications and the CQA Plan will be compiled as part of the Construction <br /> Documents . The specifications will be prepared using the industry- standard Construction <br /> Specification Institute (CSI) format. <br /> Task 6. 2 : Construction Cost Estimate <br /> Geosyntec will also prepare an Engineer ' s Estimate of Probable Construction Cost and a <br /> construction schedule to serve as a basis for comparison of bids during the procurement process . <br /> Probable construction cost will be based on estimated construction quantities for the project and <br /> engineering estimate of the probable unit cost for each item . Probable construction costs will be <br /> based on such catalogues as R . S . Means , information provided by product manufacturers , and <br /> Geosyntec ' s professional judgment and experience with similar closure system and installation <br /> projects . Additionally, Geosyntec will prepare a construction schedule based on Geosyntec ' s <br /> understanding of the Project and experience with similar closure system installation projects . <br /> Phase 7 : Construction Support Services <br /> Geosyntec proposes to perform the construction-related services and provide engineering support <br /> associated with construction of the Project under three tasks . These include : (i) Field CQA <br /> Services ; (ii ) Construction Management ; and (iii ) Resident Engineering. <br /> Task 7. 1 : Field CQA Services <br /> Under this task , Geosyntec will provide CQA services during construction of the Project . <br /> Quality assurance monitoring, testing methods , test frequencies , and the reporting requirements <br /> will be performed in accordance with the CQA Plan , ASTM Standards , and applicable portions <br /> of Chapter 62 - 701 , FAC . The work will be executed by an experienced project team consisting <br /> of office managerial staff and on- site CQA representatives . <br /> XR09I68/JL80I86 . doe <br /> t:^ n � ineurs I scientists I innovators <br />