Laserfiche WebLink
Mr. Himanshu Mehta <br />11 July 2008 <br />Page 7 <br />Geosyntec will prepare and submit a set of construction drawings for the closure system specified <br />in the Closure Permit Application as part of the vertical expansion construction drawings. The <br />construction drawings will be extracted from the permit drawings and will include sufficient <br />details for construction of the closure system, storm water features, and other related construction <br />activities associated with the closure of the Class I disposal area within Segment 2 and Infill. <br />The construction drawings will include control points along the toes of slopes, and other critical <br />locations, including 50 -ft grid intervals, to facilitate construction and certification of the Project. <br />Technical Specifications and the CQA Plan will be compiled as part of the Construction <br />Documents. The specifications will be prepared using the industry -standard Construction <br />Specification Institute (CSI) format. <br />Task 6.2: Construction Cost Estimate <br />Geosyntec will also prepare an Engineer's Estimate of Probable Construction Cost and a <br />construction schedule to serve as a basis for comparison of bids during the procurement process. <br />Probable construction cost will be based on estimated construction quantities for the project and <br />engineering estimate of the probable unit cost for each item. Probable construction costs will be <br />based on such catalogues as R.S. Means, information provided by product manufacturers, and <br />Geosyntec's professional judgment and experience with similar closure system and installation <br />projects. Additionally, Geosyntec will prepare a construction schedule based on Geosyntec's <br />understanding of the Project and experience with similar closure system installation projects. <br />Phase 7: Construction Support Services <br />Geosyntec proposes to perform the construction -related services and provide engineering support <br />associated with construction of the Project under three tasks. These include: (i) Field CQA <br />Services; (ii) Construction Management; and (iii) Resident Engineering, <br />Task 7.1: Field CQA Services <br />Under this task, Geosyntec will provide CQA services during construction of the Project. <br />Quality assurance monitoring, testing methods, test frequencies, and the reporting requirements <br />will be performed in accordance with the CQA Plan, ASTM Standards, and applicable portions <br />of Chapter 62-701, FAC. The work will be executed by an experienced project team consisting <br />of office managerial staff and on-site CQA representatives. <br />XR09I68/JL80I86.doc <br />t:^n� ineurs I scientists I innovators <br />