Laserfiche WebLink
Mr. Himanshu Mehta <br /> 11 July 2008 <br /> Page 6 <br /> Geosyntec understands some of the above analyses have been performed as part of previous <br /> permit applications ( C &D expansion and Class I landfill vertical expansion) . Geosyntec will <br /> utilize to the extent feasible most of this information in order to minimize duplication of efforts . <br /> We anticipate that finalizing the partial closure design of Segment 2 will require two progress <br /> meetings with the SWDD staff and representatives of WM . To minimize project cost, these <br /> meetings will be scheduled to coincide with progress meetings budgeted in Work Order 16 for <br /> the vertical expansion . <br /> Task 5. 2 : Closure Plan Permit Application <br /> Under Task 5 . 2 , Geosyntec will prepare the Closure Permit Application for closure of Segment 2 <br /> and Infill to El . 95 ft NGVD at the IRCL facility. The permit application will include the <br /> engineering reports and drawings in support of the permit application in accordance with Chapter <br /> 62 -701 , FAC . Geosyntec will provide four complete copies of the application to FDEP Central <br /> District and two copies to SWDD . <br /> Activities required for the completion of the permit application not included in other tasks , and <br /> activities required for the compilation, reproduction, and distribution of the permit application <br /> are included in Task 5 . 2 . For the purpose of this budget estimate, Geosyntec has included a <br /> meeting with FDEP and SWDD staff. <br /> Task 5. 3 : Response to Regulatory Comments <br /> Geosyntec will provide FDEP with written responses to requests for additional information <br /> throughout the course of the permit review process . For the purpose of the budget estimate, <br /> Geosyntec has estimated one response is required . <br /> Phase 6 : Construction Procurement Services <br /> Geosyntec will provide the engineering services required for SWDD to construct the closure <br /> system for the Segment 2 and Infill sideslopes . It is understood that SWDD will contract the <br /> construction services of the closure system to Waste Management (WM) , the current contractor <br /> for operation of the Class I landfill . As part of this task, Geosyntec will prepare construction <br /> documents and a construction cost estimate . <br /> Task 6. 1 : Construction Documents <br /> XR08168/JL80186 . doc <br /> f� � igmeers I scientists I innovators <br />