Mr. Himanshu Mehta <br />11 July 2008 <br />Page 6 <br />Geosyntec understands some of the above analyses have been performed as part of previous <br />permit applications (C&D expansion and Class I landfill vertical expansion). Geosyntec will <br />utilize to the extent feasible most of this information in order to minimize duplication of efforts. <br />We anticipate that finalizing the partial closure design of Segment 2 will require two progress <br />meetings with the SWDD staff and representatives of WM. To minimize project cost, these <br />meetings will be scheduled to coincide with progress meetings budgeted in Work Order 16 for <br />the vertical expansion. <br />Task 5.2: Closure Plan Permit Application <br />Under Task 5.2, Geosyntec will prepare the Closure Permit Application for closure of Segment 2 <br />and Infill to El. 95 ft NGVD at the IRCL facility. The permit application will include the <br />engineering reports and drawings in support of the permit application in accordance with Chapter <br />62-701, FAC. Geosyntec will provide four complete copies of the application to FDEP Central <br />District and two copies to SWDD. <br />Activities required for the completion of the permit application not included in other tasks, and <br />activities required for the compilation, reproduction, and distribution of the permit application <br />are included in Task 5.2. For the purpose of this budget estimate, Geosyntec has included a <br />meeting with FDEP and SWDD staff. <br />Task 5.3: Response to Regulatory Comments <br />Geosyntec will provide FDEP with written responses to requests for additional information <br />throughout the course of the permit review process. For the purpose of the budget estimate, <br />Geosyntec has estimated one response is required. <br />Phase 6: Construction Procurement Services <br />Geosyntec will provide the engineering services required for SWDD to construct the closure <br />system for the Segment 2 and Infill sideslopes. It is understood that SWDD will contract the <br />construction services of the closure system to Waste Management (WM), the current contractor <br />for operation of the Class I landfill. As part of this task, Geosyntec will prepare construction <br />documents and a construction cost estimate. <br />Task 6.1: Construction Documents <br />XR08168/JL80186.doc <br />cii�;irleers I scientists I innovators <br />