My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-249
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-249
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2016 10:53:28 AM
Creation date
10/1/2015 12:28:28 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
First Amendment
Approved Date
08/12/2008
Control Number
2008-249
Agenda Item Number
15.B.5
Entity Name
Geosyntec Consultants,Inc.
Subject
Amendment No.1 to Work Order No.16 Services at Landfill
Area
Southern Indian River County Landfill
Supplemental fields
SmeadsoftID
7517
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu Mehta <br /> 11 July 2008 <br /> Page 6 <br /> Geosyntec understands some of the above analyses have been performed as part of previous <br /> permit applications ( C &D expansion and Class I landfill vertical expansion) . Geosyntec will <br /> utilize to the extent feasible most of this information in order to minimize duplication of efforts . <br /> We anticipate that finalizing the partial closure design of Segment 2 will require two progress <br /> meetings with the SWDD staff and representatives of WM . To minimize project cost, these <br /> meetings will be scheduled to coincide with progress meetings budgeted in Work Order 16 for <br /> the vertical expansion . <br /> Task 5. 2 : Closure Plan Permit Application <br /> Under Task 5 . 2 , Geosyntec will prepare the Closure Permit Application for closure of Segment 2 <br /> and Infill to El . 95 ft NGVD at the IRCL facility. The permit application will include the <br /> engineering reports and drawings in support of the permit application in accordance with Chapter <br /> 62 -701 , FAC . Geosyntec will provide four complete copies of the application to FDEP Central <br /> District and two copies to SWDD . <br /> Activities required for the completion of the permit application not included in other tasks , and <br /> activities required for the compilation, reproduction, and distribution of the permit application <br /> are included in Task 5 . 2 . For the purpose of this budget estimate, Geosyntec has included a <br /> meeting with FDEP and SWDD staff. <br /> Task 5. 3 : Response to Regulatory Comments <br /> Geosyntec will provide FDEP with written responses to requests for additional information <br /> throughout the course of the permit review process . For the purpose of the budget estimate, <br /> Geosyntec has estimated one response is required . <br /> Phase 6 : Construction Procurement Services <br /> Geosyntec will provide the engineering services required for SWDD to construct the closure <br /> system for the Segment 2 and Infill sideslopes . It is understood that SWDD will contract the <br /> construction services of the closure system to Waste Management (WM) , the current contractor <br /> for operation of the Class I landfill . As part of this task, Geosyntec will prepare construction <br /> documents and a construction cost estimate . <br /> Task 6. 1 : Construction Documents <br /> XR08168/JL80186 . doc <br /> f� � igmeers I scientists I innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.