Laserfiche WebLink
Mr. Himanshu Mehta <br /> 11 July 2008 <br /> Page 4 <br /> Geosyntec will provide all engineering services necessary to complete the engineering design, <br /> permit applications , and address requests for additional information from FDEP related to the <br /> closure design . The scope of services also includes construction support services such as <br /> preparing construction drawings , construction bid documents , construction management, <br /> construction quality assurance (CQA) monitoring and certification services for the partial closure <br /> of Segment 2 and Infill side slopes . This proposal has been prepared based on the assumption <br /> that Waste Management of Florida (WM) , the Class I landfill operator and the proposed general <br /> contractor for the vertical expansion construction, will also serve in a similar function for the <br /> construction of the partial closure of Segment 2 and the infill of the Class I landfill . <br /> For <br /> budgeting purposes , the scope of work will be performed in three phases as follows : <br /> • Phase 5 : Class I Closure Design and Permitting ; <br /> o Task 5 . 1 : Engineering Design ; <br /> o Task 5 . 2 : Class I Landfill Closure Permit Application; and <br /> o Task 5 . 3 : Response to Regulatory Comments <br /> • Phase 6 : Construction Procurement Services ; <br /> o Task 6 . 1 : Preparation of Construction Documents ; and <br /> o Task 6 . 2 : Construction Cost Estimate. <br /> • Phase 7 : Construction Support Services for Class I Closure. <br /> o Task 7 . 1 : Field CQA Services ; <br /> o Task 7 . 2 : Construction Management ; and <br /> o Task 7 . 3 : Resident Engineering . <br /> Geosyntec believe that all project management activities required for this project , with the <br /> exception of those which are specific to the partial closure of Segment 2 and the Infill , can be <br /> fully addressed under the project management task of Work Order No . 16 . We have, therefore, <br /> eliminated the project management scope of services and budget from this proposal , and <br /> addressed the specific closure related issues in the remaining phases of our scope of services . <br /> Each of these phases is briefly described below : <br /> XR08168/JL80186 . doc <br /> ez, gineers I scientists I innovators <br />