My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-249
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-249
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2016 10:53:28 AM
Creation date
10/1/2015 12:28:28 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
First Amendment
Approved Date
08/12/2008
Control Number
2008-249
Agenda Item Number
15.B.5
Entity Name
Geosyntec Consultants,Inc.
Subject
Amendment No.1 to Work Order No.16 Services at Landfill
Area
Southern Indian River County Landfill
Supplemental fields
SmeadsoftID
7517
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu Mehta <br /> 11 July 2008 <br /> Page 4 <br /> Geosyntec will provide all engineering services necessary to complete the engineering design, <br /> permit applications , and address requests for additional information from FDEP related to the <br /> closure design . The scope of services also includes construction support services such as <br /> preparing construction drawings , construction bid documents , construction management, <br /> construction quality assurance (CQA) monitoring and certification services for the partial closure <br /> of Segment 2 and Infill side slopes . This proposal has been prepared based on the assumption <br /> that Waste Management of Florida (WM) , the Class I landfill operator and the proposed general <br /> contractor for the vertical expansion construction, will also serve in a similar function for the <br /> construction of the partial closure of Segment 2 and the infill of the Class I landfill . <br /> For <br /> budgeting purposes , the scope of work will be performed in three phases as follows : <br /> • Phase 5 : Class I Closure Design and Permitting ; <br /> o Task 5 . 1 : Engineering Design ; <br /> o Task 5 . 2 : Class I Landfill Closure Permit Application; and <br /> o Task 5 . 3 : Response to Regulatory Comments <br /> • Phase 6 : Construction Procurement Services ; <br /> o Task 6 . 1 : Preparation of Construction Documents ; and <br /> o Task 6 . 2 : Construction Cost Estimate. <br /> • Phase 7 : Construction Support Services for Class I Closure. <br /> o Task 7 . 1 : Field CQA Services ; <br /> o Task 7 . 2 : Construction Management ; and <br /> o Task 7 . 3 : Resident Engineering . <br /> Geosyntec believe that all project management activities required for this project , with the <br /> exception of those which are specific to the partial closure of Segment 2 and the Infill , can be <br /> fully addressed under the project management task of Work Order No . 16 . We have, therefore, <br /> eliminated the project management scope of services and budget from this proposal , and <br /> addressed the specific closure related issues in the remaining phases of our scope of services . <br /> Each of these phases is briefly described below : <br /> XR08168/JL80186 . doc <br /> ez, gineers I scientists I innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.