My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-015
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2016 2:11:18 PM
Creation date
10/1/2015 12:52:10 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
01/13/2009
Control Number
2009-015
Agenda Item Number
12.J.2
Entity Name
Geosyntec Inc.
Subject
North RO Plant Facility Work Order No. 19
Area
North County R.O. Plant
Supplemental fields
SmeadsoftID
7750
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Terry Southard <br /> 16 December 2008 <br /> Page 5 <br /> Task 3 — Site Assessment Report Preparation <br /> The FDEP requires two copies of the SAR be submitted to the FDEP . Please note the <br /> assessment efforts described above may or may not be sufficient to collect the data needed to <br /> satisfy SAR requirements ( in particular, we do not at this time know if the above efforts will be <br /> sufficient to delineate the extent of contamination) . If we find during completion of the above <br /> tasks that additional site assessment work is necessary , we will discuss our recommendations <br /> with you and seek approval prior to proceeding If additional tasks are required beyond the <br /> scope of this proposal additional budget will be required . <br /> The SAR will describe the tasks that were completed pursuant to Chapter 62 - 780 FAC and will <br /> summarize the obtained results . The SAR will include recommendations for additional <br /> monitoring and/or remediation . <br /> In an effort to address FDEP guidance, the following will be included in the SAR : <br /> • a brief summary of the site history and operations ; <br /> • a copy of the portion of the USGS topographic map that identifies the site in relation to <br /> the surrounding area ; <br /> • a vicinity map showing pertinent site features, such as utilities, aboveground and <br /> underground structures, storage areas, local drainage features, land cover , facility <br /> boundaries, and potential sources of contamination identified during the assessment ; <br /> • tables listing the monitoring well top-of-casing elevations, depths to groundwater and <br /> water- level elevations (obtained at least twice , at least one month apart and the dates the <br /> data were collected) ; <br /> • tables summarizing the groundwater analytical results, reporting limits used , and <br /> analyses performed ( listing contaminants detected and the corresponding cleanup target <br /> levels proposed for use for the site) ; <br /> • a description of the site-specific stratigraphy, based on the lithologic logs prepared <br /> during soil boring and monitoring well installation ; <br /> • details of assessment methodologies used at the site, including field screening techniques <br /> and other testing ; <br /> • monitoring well construction details and construction diagrams , including methods and <br /> materials , field sampling data sheets, lithologic logs , and volumes of groundwater <br /> removed during well development and/or purging ; <br /> FR1329/XR08264 , DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.