Laserfiche WebLink
Mr . Terry Southard <br /> 16 December 2008 <br /> Page 7 <br /> • All underground/above- ground utility/structures will be located for Geosyntec by a <br /> facility representative prior to drilling at the site ; Geosyntec will not be responsible for <br /> damage to unidentified utilities/structures . <br /> • All work can be performed in Level D personal protective equipment . <br /> • Laboratory analytical methods prescribed herein may not be available from the <br /> laboratory ; if this is the case, a similar method will be selected to analyze for the desired <br /> suite of chemical constituents . <br /> • Geosyntec will notify the FDEP of our field schedule prior to field work activities . <br /> • Sampling will be performed in general accordance with certain guidance contained <br /> within FDEP ' s standard operating procedures, effective April 2002 and modified in June <br /> 2004 . <br /> • No laboratory analyses of soil samples are required for this site assessment . <br /> • The field activities will be completed in five days or less . Please be advised that the <br /> installation of additional piezometers and/or permanent monitoring wells may be required <br /> to fully delineate the groundwater impacts ( laterally and vertically) . <br /> • The SAR is intended to comply with FDEP ' s 28 October 2008 letter and to meet the <br /> intent of a Chapter 62 - 780 , FAC , Site Assessment . <br /> ESTIMATED BUDGET <br /> A summary of estimated project costs is included in Exhibit 2 attached . <br /> FR 1329[XR08264 . DOC <br />