Laserfiche WebLink
SCHEDULE OF PRICES - INDIAN RIVER COUNTY SHERIFF ' S OFFICE UST CLOSURE <br /> Submitted by : FECC , INC . , 3652 Old Winter Garden Road , Orlando , FL 32805 Phone 4071296-9995 x 201 Contact: Gordon <br /> Kirkland DATE : 4 - 13- <br /> Extended <br /> Bid Item <br /> Unit Unit Rate Quantity Cost <br /> # item Description <br /> Fill out and submit Underground Storage Tank Installation and Removal Form for Certified <br /> 2 . 14 Contractors , July 13, 1998 [62-761 .900 ( 5 ) FAC] to Geosyntec LS $ 150 .00 1 1 $ 150 <br />. 00 <br /> 2 . 15 Contingency units for additional cost of a vacuum truck if needed HR $ 110 .00oil <br /> 2 . 16 Contingency units for additional square foot of concrete finished surface SQ FT $ 5 . 25 <br /> 5 AST System <br /> Electrical connection and operational checkout of two, IRC provided , 500-gallon ConVault AST <br /> Systems (with manufacturer provided pre-cast concrete pad and equipped with dispenser <br /> LS $ 3 , 500 . 00 1 $ 3 , 500 00 <br /> 5 . 1 systems ) <br /> $ <br /> LUMP SUM TOTAL LS 36,800 . 00 <br /> Notes : <br /> 1 , LS Items to be reimbursed following completion of specific tasks in accordance with the specifications . <br /> 2 . SUBCONTRACTOR is responsible for soil/debris transportation to IRC Class 1 Landfill , disposal fees will be directly billed <br /> to IRC Utilities , <br /> 3 . The SUBCONTRACTOR bid shall include written assurance that SUBCONTRACTOR will comply with the applicable trench safety standards <br />. <br /> Page 2 of 2 <br />