Laserfiche WebLink
Ilk l <br /> SCHEDULE OF PRICES - SHERRIF'S OFFICE UST CLOSURE <br /> Bid Item <br /> Extended <br /> # Item Description Unit Unit Rate Quanti Cost <br /> ffGeneral <br /> Provision of 40 Hr OSHA Training Certificates (and current 8-hour refreshers as applicable) for <br /> Site Workers and Documentation of PSSC licenseLS $ 100 . 00 1 $ 100 . 00 <br /> Secure and provide copies of construction permits for closure of two , 10 , 000-gallon USTs LS $ 500 . 00 1 $ 500 <br />. 00 <br /> 1 . 3 Mobilization LS $ 11000 . 00 1 $ 11000 . 00 <br /> 1 .4 Demobilization L 1 , 000000 <br /> S $ 1 , 000 . 00 1 $ <br /> I Ilk Ilk <br /> dk <br /> 2 UST Closure Activities <br /> 2 . 1 Sawcut, remove , and dispose of concrete over tank area LS $ 750 . 00 1 $ 750 . 00 <br /> 2 .2 Blow out all product lines back to USTs LS $ 500 . 00 1 $ 500 . 00 <br /> 2 . 3 Excavate overburden and stockpile for fill material LS $ 750 . 00 1 $ 750 . 00 <br /> Remove and dispose of any liquid/sludge residue in USTs ( up to three , 55-gallon drums) [62- <br /> 2.4 761 . 800 (2) (a) 1 . a , FAC] LS $ 675 . 00 1 $ 675 .00 <br /> Purge tank of flammable vapors and monitor the tank with a combustible gas meter until <br /> 2 . 5 atmosphere in tank is less than 20 % LEL LS $ 500 .00 500 . 00 <br /> 1 $ <br /> Remove and dispose of two , 10 ,000 gallon steel USTs and associated product piping at IRC <br /> 2 .6 Landfill (no tipping fee) LS $ 7 , 000 . 00 $ 7 , 000 .00 <br /> 1 <br /> 2 .7 Install a temporary monitoring well (provided by Geosytnec) in the center of the excavation LS $ 250 . 00 1 $ 250 <br />. 00 <br /> 2 . 8 Properly remove and dispose of existing fuel dispensers (including drip pans) LS $ 500 . 00 1 $ 500 . <br />00 <br /> 2 , 9 Restore concrete in former dispenser area to existing grade (ie-drip pan or sump) LS $ 500 . 00 1 $ <br /> 500 . 00 <br /> Cut and dispose of underground product and vent piping at edge of excavation & cap [62- <br /> 2 . 10 780 .800 (2) (a) l . b . FAC] LS $ 500 . 00 1 $ 500 . 00 <br /> Backfill and compact area with existing fill material and supply balance to bring area to compacted <br /> LS $ 2 , 000 . 00 1 $ 22000 . 00 <br /> 2 . 11 subgrade <br /> Supply , install and broom finish an area up to 35 x 40 x 6" over the excavation area with 3 , 000 psi LS $ <br /> 7t350 , 00 t $ 71350 . 00 <br /> 2 . 12 fibermesh concrete <br /> Page 1 of 2 <br />