Laserfiche WebLink
ff <br /> SCHEDULE OF PRICES - SHERRIF ' S OFFICE UST CLOSURE <br /> Extended <br /> Bid Item <br /> Unit Unit Rate Quanti Cost <br /> # Item Description <br /> 2 . 13 Clean area and dispose of all related construction debris at IRC Class I landdfill ( no tipping fee) LS $ 500 <br />. 00 1 $ 500 . 00 <br /> Fill out and submit Underground Storage Tank Installation and Removal Form for Certified 250 . 00 <br /> 2 . 14 Contractors , July 13 , 1998 [62m761 * 900 (5) FAC] to Geosyntec LS $ 250 . 00rr <br /> 1 $ <br /> Yzr G f <br /> 2 . 15 Contingency units for additional cost of a vacuum truck if needed HR 125 . 00 plus <br /> 2 . 16 lContingency units for additional square foot of concrete finished surface SQ FT $ 5 , 25 <br /> y;. <br /> 5 AST System <br /> Electrical connection and operational checkout of two , IRC provided , 500-gallon ConVault AST <br /> Systems (with manufacturer provided pre-cast concrete pad and equipped with dispenser 11500 .00 <br /> 5 . 1 systems77 <br /> ) LS $ 1 , 500 00 1 $ <br /> LUMP SUM TOTAL LS $ 263125.00 <br /> Notes : <br /> 1 . LS Items to be reimbursed following completion of specific tasks in accordance with the specifications . <br /> 2 . SUBCONTRACTOR is responsible for soilldebris transportation to IRC Class I Landfill , disposal fees will be directly billed <br /> to IRC Utilities . <br /> 3 . The SUBCONTRACTOR bid shall include written assurance that SUBCONTRACTOR will comply with the applicable trench safety standards <br />. <br /> If the tank is not empty , the vac truck will get the fuel out of the tank. That would be an extra . <br /> PR&D has included a vac truck to evacuate the sludge & clean the tank inplace , prior to removal . <br /> PR& D will comply with statement # 3 above . <br /> I ` Estimated 1 week on site . <br /> Page 2 of 2 <br />