My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-123
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-123
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2016 12:16:32 PM
Creation date
10/1/2015 3:32:02 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/05/2009
Control Number
2009-123
Agenda Item Number
8.O.
Entity Name
Geosyntec Inc.
Subject
Work Order No.21 Underground Fuel Tanks
Area
Sheriff's Administration Building
Supplemental fields
SmeadsoftID
10617
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ff <br /> SCHEDULE OF PRICES - SHERRIF ' S OFFICE UST CLOSURE <br /> Extended <br /> Bid Item <br /> Unit Unit Rate Quanti Cost <br /> # Item Description <br /> 2 . 13 Clean area and dispose of all related construction debris at IRC Class I landdfill ( no tipping fee) LS $ 500 <br />. 00 1 $ 500 . 00 <br /> Fill out and submit Underground Storage Tank Installation and Removal Form for Certified 250 . 00 <br /> 2 . 14 Contractors , July 13 , 1998 [62m761 * 900 (5) FAC] to Geosyntec LS $ 250 . 00rr <br /> 1 $ <br /> Yzr G f <br /> 2 . 15 Contingency units for additional cost of a vacuum truck if needed HR 125 . 00 plus <br /> 2 . 16 lContingency units for additional square foot of concrete finished surface SQ FT $ 5 , 25 <br /> y;. <br /> 5 AST System <br /> Electrical connection and operational checkout of two , IRC provided , 500-gallon ConVault AST <br /> Systems (with manufacturer provided pre-cast concrete pad and equipped with dispenser 11500 .00 <br /> 5 . 1 systems77 <br /> ) LS $ 1 , 500 00 1 $ <br /> LUMP SUM TOTAL LS $ 263125.00 <br /> Notes : <br /> 1 . LS Items to be reimbursed following completion of specific tasks in accordance with the specifications . <br /> 2 . SUBCONTRACTOR is responsible for soilldebris transportation to IRC Class I Landfill , disposal fees will be directly billed <br /> to IRC Utilities . <br /> 3 . The SUBCONTRACTOR bid shall include written assurance that SUBCONTRACTOR will comply with the applicable trench safety standards <br />. <br /> If the tank is not empty , the vac truck will get the fuel out of the tank. That would be an extra . <br /> PR&D has included a vac truck to evacuate the sludge & clean the tank inplace , prior to removal . <br /> PR& D will comply with statement # 3 above . <br /> I ` Estimated 1 week on site . <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.