Laserfiche WebLink
Mr. Terry Southard <br /> 31 March 2008 <br /> Page 3 <br /> includes recommendations for the site. As requested by the FDEP , the letter report will <br /> include a MSDS for sodium hydroxide and a proposed background well location with <br /> construction details (for FDEP ' s approval) . The final letter report (up to five copies) will be <br /> signed/sealed by the Florida licensed Professional Engineer in responsible charge of the <br /> project. <br /> ASSUMPTIONS <br /> During the preparation of this proposal, Geosyntec has made the following assumptions : <br /> • Access to sampling locations is not restricted to Geosyntec. <br /> • All sampling can be performed in Level D personal protective equipment. <br /> • The field activities will be completed in two days . Please be advised that the installation <br /> of additional piezometers and/or a permanent monitoring well network may be required <br /> to fully delineate the pH impacts (laterally and vertically) . <br /> • The letter report is intended to specifically comply with FDEP ' s 19 February 2008 letter <br /> and is not intended to meet the intent of a Chapter 62 -780, Florida Administrative Code <br /> Site Assessment. <br /> • Geosyntec will be able to work unimpeded between Monday and Friday from 7 am - 7 <br /> pm. <br /> ESTIMATED BUDGET <br /> A summary of estimated project costs is included in Exhibit 2 attached. <br /> CLOSURE <br /> Geosyntec appreciates the opportunity to submit this proposal to provide environmental <br /> consulting services to the IRC Utilities Department. Upon execution of the Work Order, <br /> Geosyntec will immediately schedule the field activities. We anticipate that the field activities <br /> will be completed within three weeks of Work Order execution. The letter report summarizing <br /> the field activities will be completed within approximately two weeks of receipt of the laboratory <br /> analytical results. <br /> FR1329/CCR08028 . DOC - <br /> engineers I scientists I innovators <br />